"先缆后梁"施工建造自锚式悬索桥的研究
引用本文:文曙东,郑凯锋,黄军."先缆后梁"施工建造自锚式悬索桥的研究[J].西南交通大学学报,2005,40(6):750-753.
作者姓名:文曙东  郑凯锋  黄军
作者单位:1. 西南交通大学土木工程学院,四川,成都,610031
2. 四川达渝高速公路建设开发有限公司,四川,达州,635000
摘    要:针对100~400 m中小跨度的自锚式悬索桥,提出了一种先架缆后挂梁的设计施工方案.计算了施工过程中墩顶必须承受的最大水平拉力,分析了桥墩尺寸、临时固结和稳定性等关键问题.结果表明,在中小跨度范围内,墩顶最大水平力可以由墩来承受,从而能够克服目前自锚式悬索桥“先梁后缆”施工的弊端.

关 键 词:自锚式悬索桥  先架缆后挂梁  结合梁
文章编号:0258-2724(2005)06-0750-04
收稿时间:2004-11-22
修稿时间:2004-11-22

"Erecting Cable before Constructing Girder" Construction Method of Self-Anchored Suspension Bridges
WEN Shu-dong,ZHENG Kai-feng,HUANG Jun."Erecting Cable before Constructing Girder" Construction Method of Self-Anchored Suspension Bridges[J].Journal of Southwest Jiaotong University,2005,40(6):750-753.
Authors:WEN Shu-dong  ZHENG Kai-feng  HUANG Jun
Institution:1. School of Civil Eng. , Southwest Jiaotong University, Chengdu 610031, China; 2. Sichuan Dayu Expressway Co. , Ltd, Dazhou 635000, China
Abstract:To expand the application range of self-anchored suspension bridges,a novel construction method was brought up for self-anchored suspension bridges with a short span ranging from 100 to(400 m.) It is called as"erecting cable before constructing girder"(ECBCG) construction method and means that in the construction of a self-anchored suspension bridge the girder is constructed after the cable has been erected.The maximum horizontal force that the pier must endure was investigated,and some key problems,such as the size of the pier,the temporary join and the stabilization during construction,were discussed.The results show that the horizontal force can be acceptable for this type of bridge within a certain range of span for this method to overcome the shortcoming of the construction method of "constructing girder before erecting cable".
Keywords:self-anchored suspension bridge  erecting cable before constructing girder  composite girder