混凝土斜拉桥施工监控方法研究 |
| |
引用本文: | 李洪泉.混凝土斜拉桥施工监控方法研究[J].北方交通,2008(4):200-202. |
| |
作者姓名: | 李洪泉 |
| |
作者单位: | 河北省大广高速公路京衡段筹建处,深州,053800 |
| |
摘 要: | 在预应力混凝土斜拉桥中几何线形和结构内力的控制十分重要,应根据斜拉桥的结构及施工特点,制定出相应的施工监控方案.据此以德州市新河斜拉桥为实例,介绍了该斜拉桥施工监控的内容和方法,并通过实残取得了一些成果.
|
关 键 词: | 桥梁工程 混凝土斜拉桥 施工 监控方法 |
文章编号: | 1673-6052(2008)04-0200-03 |
Research on Monitoring Methods for Concrete Cable Stayed Bridge Construction |
| |
Authors: | LI Hong-quan |
| |
Institution: | LI Hong-quan |
| |
Abstract: | For prestressed concrete cable-stayed bridge,the control of geometric alignment and internal force of strcutcure is fully important.Schemes for construction monitoring should be drawn up according to structure of cable-stayed bridge and essentials for construction.On these grounds,as example with Xinhe cable-stayed bridge in Dezhou City,the paper introduces its contents and methods for construction monitoring and some results achieved through practice. |
| |
Keywords: | Bridge engineering Concrete cable-stayed bridge Construction Monitoring methods |
本文献已被 CNKI 维普 万方数据 等数据库收录! |