某特大桥(40+64+40)m连续梁主墩墩顶临时固结设计 |
| |
引用本文: | 张艳艳.某特大桥(40+64+40)m连续梁主墩墩顶临时固结设计[J].北方交通,2011(5):101-103. |
| |
作者姓名: | 张艳艳 |
| |
作者单位: | 辽宁省公路勘测设计公司,沈阳,110000 |
| |
摘 要: | 连续梁分别从主墩进行悬臂浇筑,为了承受T构悬臂施工中不平衡弯矩,需在墩顶设置临时支座。对临时支座的设计计算进行了详细的介绍。
|
关 键 词: | 特大桥 连续梁 墩顶临时固结 不平衡弯矩 |
Temporary Consolidation Design of(40+64+40) m Main Pier Top of Certain Grand Bridge 's Continuous Beam |
| |
Authors: | ZHANG Yan-yan |
| |
Abstract: | continuous beam is casted from main piers respectively with cantilever method.Temporary support on pier top is set to bear the unbalance bending moment during T cantilever construction.The design and calculation of temporary support are introduced in detail. |
| |
Keywords: | Grand bridge Continuous beam Pier top temporary consolidation Unbalance bending moment |