首页 | 本学科首页   官方微博 | 高级检索  
     检索      

某预应力混凝土连续梁桥施工控制技术
引用本文:李海翔.某预应力混凝土连续梁桥施工控制技术[J].广东交通职业技术学院学报,2012,11(2):31-34.
作者姓名:李海翔
作者单位:广州市公路工程公司,广东广州,510075
摘    要:文中结合广州番禺龙湾大桥的工程特点,分析了预应力混凝土连续梁桥施工过程中主要工艺参数的控制技术,介绍预应力混凝土连续梁悬臂施工监控的主要内容及方法,总结了施工中进行控制的方法,使桥梁的施工质量处于受控状态。

关 键 词:预应力混凝土  连续梁桥  施工控制技术

A Pre-stressed Concrete Continuous Beam Bridge Construction Control Technique
LI Hai-xiang.A Pre-stressed Concrete Continuous Beam Bridge Construction Control Technique[J].Journal of Guangdong Communication Polytechnic,2012,11(2):31-34.
Authors:LI Hai-xiang
Institution:LI Hai-xiang(Highway Engineering Company of Guangzhou City,Guangzhou 510075,China)
Abstract:Combined with the engineering characteristic of Longwan Bridge,this paper analyzed the control technique of main construction parameters,and introduced the control emphasis of pre-stressed concrete continuous beam bridge during the bridge construction.the control emphasis includes deflection control and stress control.It also generalized the control method of continuous beam bridge to guarantee the bridge quality is under control.
Keywords:pre-stressed concrete  continuous beam bridge  construction control technique
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号