上海自然博物馆基坑地下连续墙变形研究
引用本文:李岩松,邹吉聪.上海自然博物馆基坑地下连续墙变形研究[J].华东交通大学学报,2012,29(2):51-56,107.
作者姓名:李岩松  邹吉聪
作者单位:1. 上海科技馆自然博物馆管理处,上海,200127
2. 同济大学道路与交通工程教育部重点实验室,上海,201804
基金项目:上海市科学技术委员会资助项目(10231200702)
摘    要:新建上海自然博物馆基坑工程为深大异形坑中坑工程,周围环境复杂,施工风险大.利用三维有限元模拟方法,计算内外坑开挖过程中外坑地下连续墙的变形,选取模型中内外坑地下连续墙5种不同间距处的计算结果与现场监测数据对比,得出内外坑连续墙间距小于20m时外坑连续墙最大水平位移随内外坑间距增大而增大,但当内外坑地连墙间距大于20m时,内外坑地连墙间距变化对外坑连续墙最大水平位移影响不大;该工程坑中坑内坑开挖对外坑地连墙水平变形影响较小.

关 键 词:深大异形基坑  坑中坑  地连墙  数值模拟

A Research on the Deformation of Continuous Wall in the Foundation Pit of Shanghai Natural History Museum
Li Yansong , Zou Jicong.A Research on the Deformation of Continuous Wall in the Foundation Pit of Shanghai Natural History Museum[J].Journal of East China Jiaotong University,2012,29(2):51-56,107.
Authors:Li Yansong  Zou Jicong
Institution:1.Management Office of Natural History Museum,Shanghai Science and Technology Museum,Shanghai 200127,China;2.Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 201804,China)
Abstract:The foundation pit project of newly built Shanghai Natural Museum is a project of irregular deep-pit excavation,with complex surrounding environment and great construction risk.Using three-dimensional finite element simulation method,deformation of the external pit underground continuous walls is calculated in the process of internal and external pit excavation.Calculation results of five different spacing of internal and external pit of underground continuous walls in the model are selected to make a comparison with on-the-spot monitoring data.The result is that the maximum horizontal displacement,when the distance between the pit wall of the internal and external pit continuous walls is less than 20m,will increase with the increasing distance between the internal and external pit.However,when the the distance between the internal and external pit continuous walls is more than 20m,the effect of maximum horizontal displacement is little,pit-in-pit excavation in this project has little influence on deformation of external pit continuous walls.
Keywords:irregular deep-large excavation  pit-in-pit excavation  continuous wall  numerical simulation