太原至佳县高速公路隧道溶洞及涌水处治技术浅析 |
| |
引用本文: | 闫立来.太原至佳县高速公路隧道溶洞及涌水处治技术浅析[J].山西交通科技,2013(5):41-42. |
| |
作者姓名: | 闫立来 |
| |
作者单位: | 山西省交通科学研究院,山西太原030006 |
| |
摘 要: | 隧道穿过岩溶区,选线时必须认真勘测,全面比较。当无法逾越时,要避重就轻,加强岩溶区溶洞及涌水的处治预案设计。结合太佳高速公路隧道溶洞及涌水处治做简要浅析。
|
关 键 词: | 隧道 溶洞 涌水 处治 设计 |
The Analysis of the Treatment Technology of Karst Cave and Water Bursting for Taijia Highway Tunnel |
| |
Institution: | YAN Li.lai ( Shanxi Transportation Research Institute, Taiyuan, Shanxi 030006, China) |
| |
Abstract: | This paper briefly analyzed the treatment of karst cave and water bursting of Taijia Highway Tunnel for discussion. |
| |
Keywords: | tunnel karst cave water bursting treatment design |
本文献已被 维普 等数据库收录! |
|