首页 | 本学科首页   官方微博 | 高级检索  
     检索      

单双线区段通过能力计算方法研究
引用本文:钱名军,李引珍.单双线区段通过能力计算方法研究[J].兰州铁道学院学报,2014(3):192-198.
作者姓名:钱名军  李引珍
作者单位:兰州交通大学交通运输学院,甘肃兰州730070
基金项目:兰州交通大学青年科学基金(2014029)
摘    要:在单线区段的困难区间修建双线插入段或双线区间是增强区段通过能力和提高列车旅行速度的有效措施.修正了"外包区间"的概念、提出了"双插段单元"和"双线区间单元"(统称"双线单元")以及在双线单元实现列车双通过周期适应范围的概念;指出双线单元的通过能力是取决于区段条件的变量,取得最大通过能力的基本特征是单元内各区间的周期相等,双线单元只能在一定的运行图周期范围内实现列车双通过且适应的周期范围对于单元上行方向和下行方向一般是不一致的.在这一研究的基础上提出了单双线区段通过能力的计算方法.研究结论可以为单线区段扩能提速设计和单双线区段运营组织提供理论依据.

关 键 词:单双线列车运行图  双线插入段  双线区间  双线单元  区段通过能力

Method for Calculating Through Capacity of Single and Double Track Railway Section
QIAN Ming-jun,LI Yin-zhen.Method for Calculating Through Capacity of Single and Double Track Railway Section[J].Journal of Lanzhou Railway University,2014(3):192-198.
Authors:QIAN Ming-jun  LI Yin-zhen
Institution:(School of Traffic and Transportation, Lanzhou Jiaotong University, Lanzhou 730070,China)
Abstract:Building double-track insertion interval or double-track interval in the single track section is one of the effective measures to enhance the through capacity and increase the train traveling speed of the railway section.Firstly,the conceptions of the adjacent section outside the double-track insertion or the double-track interval,the double-track insertion unit and the double-track interval unit (both can be called as a double track unit),and the adaptive ranges of the train schedule circle for the trains both in the up and down directions to pass through the unit are revised and put forward.Secondly,it is figured out that the through capacity of the unit is a variable depending on the section's conditions;the basic characteristics for the unit to achieve the maximum through capacity are that all the train schedule circles of the intervals in the unit are equal;the situations for the trains of both the two directions to pass through the double-track unit can happen only when the train schedule circles in the section are in certain ranges and the ranges of up and down directions are different.On this research basis,the method for calculating the through capacity of the single and double track section is proposed.The conclusions of this paper can be used as a theoretical basis for designing the projects expanding through capacity and organizing the operations of the single track sections.
Keywords:train diagram for single and double track section  double track insertion  double track section  double track unit  through capacity of railway section
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号