南京长江第四大桥主缆架设关键技术
引用本文:栾昌花,.南京长江第四大桥主缆架设关键技术[J].现代交通技术,2012,9(5):45-47.
作者姓名:栾昌花  
作者单位:南京长江第四大桥建设指挥部,江苏南京,210033
摘    要:南京长江第四大桥为主跨1418m的双塔3跨悬索桥,其主缆采用新型锚固钢板式锚固系统。主缆索股采用预制平行索股(PPws)法架设,除设置通长索股外,在南北边跨各增设若干背索。文章系统介绍了南京四桥主缆索股架设关键技术,可供后续类似工程参考。

关 键 词:桥梁工程  主缆架设  预制平行索股  锚固钢板式锚固系统

Key Technologies of Main Cable Erection of the Fourth Nanjing Yangtze River Bridge
Luan Changhua.Key Technologies of Main Cable Erection of the Fourth Nanjing Yangtze River Bridge[J].Modern Transportation Technology,2012,9(5):45-47.
Authors:Luan Changhua
Institution:Luan Changhua (Construction Headquarters of the Fourth Nanjing Yangtze River Bridge,Nanjing 210033,China)
Abstract:The 4th Yangtze River Bridge in Nanjing is a three-span suspension bridge with double tower which main span is 14IBm,the main cable using a new type anchorage system with anchored steel plate and is erected by prefabricated parallel wire strands (PPWS),besides the continuous cable strands, some backstay cables are added at the south and north side spans respectively. This paper introduces the key technologies of main cable erection of the Fourth Nanjing Yangtze River Bridge systematically, which are available for similar projects.
Keywords:bridge engineering  main cable erection  prefabricated parallel wire strands  anchorage system with an-chored steel plate