武汉江汉四桥合理施工状态的确定
引用本文:颜东煌,袁帅华,郭奕众.武汉江汉四桥合理施工状态的确定[J].长沙交通学院学报,1999,15(2):65-69.
作者姓名:颜东煌  袁帅华  郭奕众
作者单位:1. 长沙交通学院,湖南,长沙,410076
2. 湘潭工学院,湖南,湘潭,411100
3. 广州港工程设计所,广东,广州,510700
摘    要:采用正装迭代法确定武汉江汉四桥(不对称独塔PC斜拉桥)的合理施工状态,准确模拟了主桥施工过程,分析了主桥合成方案。

关 键 词:斜拉桥  施工状态  正装迭代法
修稿时间:1999-03-16

The Rational Construction State of Jianghan Fourth Bridge in Wuhan
YAN Dong-huang,YUAN Shuai-hua,GUO Yi-zhong.The Rational Construction State of Jianghan Fourth Bridge in Wuhan[J].Journal of Changsha Communications University,1999,15(2):65-69.
Authors:YAN Dong-huang  YUAN Shuai-hua  GUO Yi-zhong
Abstract:The forward-iteration method is used to determine the rational construction state of the Jianghan Fourth Bridge in Wuhan(a symmetric single pylon PC cable-stayed bridge). The construction process of the main bridge is monitored accurately. The closing method of the main bridge is analysed.