大断面地铁车站隧道软弱围岩渐进破坏规律模型试验研究
引用本文:孔超,侯志强,朱晓雨,姚勇,王海彦,张俊儒.大断面地铁车站隧道软弱围岩渐进破坏规律模型试验研究[J].中国铁道科学,2020(1):78-84.
作者姓名:孔超  侯志强  朱晓雨  姚勇  王海彦  张俊儒
作者单位:西南科技大学土木工程与建筑学院;工程材料与结构冲击振动四川省重点实验室;中国中铁四局集团第五工程有限公司;南京工业大学交通运输工程学院;西南交通大学交通隧道工程教育部重点试验室;西南交通大学土木工程学院
基金项目:河北省教育厅重点项目(ZD2017248);西南科技大学博士基金资助项目(17zx7101,13ZX7146)
摘    要:以贵阳市地铁2号线阳明祠车站为背景,采用室内模型试验模拟大断面地铁车站施工过程中隧道塌方破坏过程,明确施工期间大断面隧道塌方破坏过程机制,对比分析围岩和路面的变形。结果表明:通过围岩重力作用模拟隧道施工过程中塌方过程,与实际塌方过程基本吻合,弥补了常规加载破坏的不足;围岩渐进破坏过程表现为裂隙出现-裂隙发展-裂隙贯通-围岩塌方,支护渐进破坏过程表现为变形缓慢增加-变形快速增加-裂缝快速发展-支护破坏;围岩渐进破坏与支护渐进破坏相互作用,共同发展;在实际施工过程中,当支护变形大幅增加时,应增加支护强度,同时还应及时注浆、打设长锚杆,以减缓围岩裂隙发展,阻断围岩渐进破坏过程。

关 键 词:地铁车站  软弱围岩  隧道塌方  大断面  渐进破坏

Model Test Study on Progressive Failure Law of Weak Surrounding Rock in Large Section Subway Station Tunnel
KONG Chao,HOU Zhiqiang,ZHU Xiaoyu,YAO Yong,WANG Haiyan,ZHANG Junru.Model Test Study on Progressive Failure Law of Weak Surrounding Rock in Large Section Subway Station Tunnel[J].China Railway Science,2020(1):78-84.
Authors:KONG Chao  HOU Zhiqiang  ZHU Xiaoyu  YAO Yong  WANG Haiyan  ZHANG Junru
Institution:(School of Civil Engineering and Architecture,Southwest University of Science and Technology,Mianyang Sichuan 621010,China;Shock and Vibration of Engineering Materials and Structures Key Laboratory of Sichuan Province,Mianyang Sichuan 621010,China;The Fifth Construction Ltd.of China Tiesiju Civil Engineering Group,Jiujiang Jiangxi 332000,China;College of Transportation Science&Engineering,Nanjing Tech University,Nanjing Jiangsu 210009,China;Key Laboratory of Transportation Tunnel Engineering,Ministry of Education,Southwest Jiaotong University,Chengdu Sichuan 610031,China;School of Civil Engineering,Southwest Jiaotong University,Chengdu Sichuan 610031,China)
Abstract:The process of tunnel collapse during the construction of large section subway station was studied by the indoor model test based on the Yangmingci subway station of Guiyang Metro line 2.The collapse process mechanism of large section tunnel during construction was defined,and the deformation of both the surrounding rock and pavement was compared.Results show that the process of collapse in the tunnel construction process simulated by the gravity action of surrounding rock is basically consistent with the actual collapse process,which makes up for the deficiency of the conventional loading failure.The progressive failure process of surrounding rock is shown as the appearance of fissure,the development of fissure,the penetration of fissure and the collapse of surrounding rock.The progressive failure process of support is shown as the slow increase of deformation,the rapid increase of deformation,the rapid development of fracture and the support failure.The progressive failure process of surrounding rock and that of support interact and develop together.In the actual construction process,when the deformation of support increases significantly,the support strength should be increased.At the same time,grouting and setting long bolts should be done in time to slow down the development of surrounding rock fracture and block the progressive failure process of surrounding rock.
Keywords:Subway station  Weak surrounding rock  Tunnel collapse  Large section  Progressive failure