首页 | 本学科首页   官方微博 | 高级检索  
     检索      

关垭子隧道软弱围岩大变形机理分析
作者单位:;1.西南交通大学交通隧道工程教育部重点实验室
摘    要:关垭子隧道穿越极高地应力状态软岩,施工过程中发生了大变形。在工程地质勘查、现场调研、岩石力学试验及监控量测的基础上,通过分析隧道变形特征,从隧道埋深、施工方法、围岩岩性、地应力及地下水等方面研究该隧道大变形的发生机理。研究结果表明:该隧道大变形以围岩塑性变形为主,膨胀变形影响较小,并对类似隧道的设计施工进行了展望。

关 键 词:隧道  软弱围岩  极高地应力  大变形  变形机理

Study on Large Deformation Mechanism of Soft Rock in Guanyazi Tunnel
Institution:,MOE Key Laboratory of Transportation Tunnel Engineering,Southwest Jiaotong University
Abstract:Guanyazi tunnel passes through soft rock of extremely high ground stress and experiences large deformation during construction. On the basis of engineering geology investigation,on-site survey,rock mechanics experiments and monitoring measurement,this paper studies the large deformation mechanism of the tunnel by analyzing tunnel deformation characteristics in terms of construction method,surrounding rock lithology,ground stress and groundwater. The results show that the tunnel large deformation is dominated by plastic deformation with a little swelling deformation. Future design and construction of similar tunnels are also envisaged.
Keywords:Tunnel  Soft rock  Extremely high ground stress  Large deformation  Deformation mechanism
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号