CTS2型转辙机的安装及调试技术
引用本文:王晓光.CTS2型转辙机的安装及调试技术[J].电气化铁道,2007(1):40-43.
作者姓名:王晓光
作者单位:青藏工程指挥部工程部,青海海东,810600
摘    要:结合青藏线工程实际,介绍了我国首次引进适合青藏线恶劣环境,由GE公司研制开发的轨枕式一体化免维护CTS2型转辙机的特点、转辙机的安装流程和安装方法,并就CTS2型转辙机的机械调整及电气调试作了全面的论述.

关 键 词:转辙机:安装流程  机械调整
文章编号:1007-936X(2007)01-0040-04
修稿时间:2006年11月28

Installation and Commissioning Technologies for CTS2 Point Machine
Wang Xiaoguang.Installation and Commissioning Technologies for CTS2 Point Machine[J].Electric Railway,2007(1):40-43.
Authors:Wang Xiaoguang
Institution:Wang Xiaoguang
Abstract:With reference of actual practice in construction of Qinghai-Tibet railway, introduces the characteristics, installation procedures and methods for integrated, maintenance free CTS2 point machine, which is manufactured by GE company, imported for the first time and suitable for worse climate conditions in Qinghai-Tibet railway; gives a thorough illustration on its mechanical adjustment and electrical commissioning.
Keywords:Point machine  installation procedure  mechanical adjustment