首页 | 本学科首页   官方微博 | 高级检索  
     检索      

广州地铁1号线列车调整原理和方法介绍
引用本文:黄贵荣,田媛媛.广州地铁1号线列车调整原理和方法介绍[J].世界轨道交通,2007(2):44-45.
作者姓名:黄贵荣  田媛媛
摘    要:广州地铁1号线ATS系统中,有一个ATR(列车自动调整)程序,能够根据时刻表对列车运行进行自动调整,也可以人工对列车运行进行调整。

关 键 词:广州地铁1号线  列车运行  调整原理  自动调整  ATS系统  ATR  时刻表

The Train Readjustment Ways and Principle of Guangzhou Metro Line 1
Authors:Huang Guirong  Tian Yuanyuan
Abstract:For metro transportation, the rate of punctuality is always an important index in judging the dispatching ability. In order to arrange the train according to the timetable, that is, try hard to ensure the arrival time conform to the timetable, we must overcome every difficult factor that affect the train on time. We need both the auto with signal system and readjustment by hand in daily train management. This article analyses the principle of auto and man-power readjustment in train traneportation, basing on the system of Guangzhou metro line 1, summing up a report about the ways of readjustment in train management
Keywords:
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号