桩身完整性检测在CFG桩施工过程中的质量控制
引用本文:常聚友,杨丽.桩身完整性检测在CFG桩施工过程中的质量控制[J].铁道工程学报,2011(4):120-125.
作者姓名:常聚友  杨丽
作者单位:中铁二院工程集团有限责任公司,成都,610031
摘    要:研究目的:本文通过CFG桩完整性检测,对空洞、夹泥、夹土、夹砂浆、缩径、严重离析(蜂窝状、砂石分离状)等施工原因引起的问题进行研究.为确保CFG桩质量完整,应从施工预防着手,制定施工措施,加强施工质量控制.研究结论:CFG桩混凝土灌注时要严格执行"灰包钻"施工法,即灌注混凝土时始终混凝土灌注面包着钻头0.5~1 m 同...

关 键 词:CFG桩  桩身完整性  施工措施  质量控制

Quality Control of Pile Integrity Testing of Cement-flyash-gravel Pile in Construction Process
CHANG Ju-you,YANG Li.Quality Control of Pile Integrity Testing of Cement-flyash-gravel Pile in Construction Process[J].Journal of Railway Engineering Society,2011(4):120-125.
Authors:CHANG Ju-you  YANG Li
Institution:(China Railway Eryuan Engineering Group Co.Ltd.Chengdu,Sichuan 610031,China)
Abstract:Research purposes: From the integrity testing of cement-flyash-gravel pile,it was found that the empty holes,the mud,the soil,mortar between folders,shrinkage diameter and severe maceration(types of honeycomb and separation of sand and stones) appearred in some CFG piles.The study was done on the reasons for these defects.In order to ensure the integrity quality of cement-flyash-gravel pile,the relative construction measures should be taken and the control of the construction quality should be strengthened. Research conclusions:The construction method of "concrete wrapping drill" should be adopted when pouring the concrete of cement-flyash-gravel pile.That is,when the concrete is poured,the pouring surface of concrete should always wrap the drill by 0.5-1 metre and synchronously rise with the drill.The concrete slump constant should be controlled to 16-20 cm,In the anhydrous stratum,the pouring velocity of the concrete should be controlled to 2-3 m/min.In the water stratum,the pouring velocity of the concrete should be controlled to 1 m/min.In water-rich stratum,the 80 type high-power should be used.In the soft plastic clay stratum(including water layer),the slow pressure construction method should be used for pouring concrete.The pouring of concrete of cement-flyash-gravel pile should be continuous and can not be interrupted.If interrupted,the pile should continue to downward whirl to the depth of 0.5-1.0 m to drill away the mortar and severe maceration concrete for integrating the new concrete with the concrete at the bottom.
Keywords:cement-flyash-gravel pile  pile integrity  construction measures  quality control