宜万铁路万州长江大桥设计与施工
引用本文:秦顺全.宜万铁路万州长江大桥设计与施工[J].铁道工程学报,2006(2):20-23.
作者姓名:秦顺全
作者单位:中铁大桥局集团有限公司,湖北,武汉,430050
摘    要:研究目的根据宜万铁路跨越长江的关键性控制工程——万州长江大桥,位于峡谷地段,水深流急,江中不宜设置桥墩的特点,对该桥设计、施工关键技术进行研究,解决大跨度钢桁拱设计、施工关键技术问题。研究方法结合桥址处的地质、地形、通航、水文条件,进行综合技术经济比较,采用结构分析计算和桥梁结构动力学与车辆动力学的研究方法。研究结果针对国内首次采用钢桁拱—桁梁组合体系的大跨度铁路桥梁的建设,探索出一套成功的设计、施工经验和一系列有针对性的技术措施。研究结论正桥采用168m 360m 180m三跨连续钢桁拱-桁梁组合结构桥。桁宽采用16m,列车行车安全及舒适性有保障;吊杆合理开孔,有效拟制了风致振动;钢桁拱的架设必须采用爬坡式吊机架设;合理的安装顺序和工艺技术措施保证了钢桁拱的高精度合龙。

关 键 词:万州长江大桥  钢桁拱  刚度  风致振动  合龙
文章编号:1006-2106(2006)02-0020-04
收稿时间:2006-01-18
修稿时间:2006年1月18日

DESIGN AND CONSTRUCTION OF WANZHOU YANGTZE RIVER BRIDGE ON YICHANG-WANZHOU RAILWAY LINE
QIN Shun-quan.DESIGN AND CONSTRUCTION OF WANZHOU YANGTZE RIVER BRIDGE ON YICHANG-WANZHOU RAILWAY LINE[J].Journal of Railway Engineering Society,2006(2):20-23.
Authors:QIN Shun-quan
Institution:China Zhongtie Major Bridge Engineering Group Co. Ltd, Wuhan, Hubei 430050, China
Abstract:Research purposes: Construction of Wanzhou Yangtze River Bridge was a key controlled project for Yichang-Wanzhou Railway to cross Yangtze River. The site of the bridge was in gorge with deep water and fast current and it was not suitable to build bridge pier in the river. The technical problems in design and construction of large span steel trussed arch were solved through making researches on the key technologies for design and construction of the bridge. Research methods:With consideration of the conditions of geology, topography, navigation and hydrology, the integral comparisons of technology and economy were made by adopting methods of structure analysis and calculation, bridge structure dynamics and rolling stock dynamics. Research results: The main steel beam adopted the composite structure of steel trussed arch beam and it was the first time to be adopted in China. The bridge was the largest span bridge in China. The paper explored a set of successful design and construction experience. And a series of technical researches made for construction of the bridge. Research conclusions: The composite structure bridge with three-span continuous steel trussed arch beam of 168 m 360 m 180 m was adopted for main bridge. The safety of train running and comfortableness were ensured due to adopting the truss with width of 16 m. The gentle vibration was effectively controlled due to nationally drilling hole on suspension rod. The frame of steel trussed arch had to be erected by climbing crane. The high accuracy closure of steel trussed arch was ensured due to using correct assembly order and taking national technical measures.
Keywords:Wanzhou Yangtze River Bridge  steel trussed arch  rigidity  gentle vibration  closure  