首页 | 本学科首页   官方微博 | 高级检索  
     检索      

广州地铁投标中几个清单项目价格的合理确定
引用本文:王锦芳.广州地铁投标中几个清单项目价格的合理确定[J].铁路工程造价管理,2007,22(5):15-17.
作者姓名:王锦芳
作者单位:中铁十局集团,建筑工程有限公司,山东,济南,250001
摘    要:简要就广州地铁工程项目在投标报价中的土石方开挖及回填、自发电补差、临时房屋及设施、车站主体围护结构几个清单项目单价或合价的确定做一介绍,为在较低总价中标时,尽量减少合同风险提供一点可能的参考。

关 键 词:广州地铁工程  清单项目价格  合理确定
文章编号:1007-9890(2007)05-0015-03
修稿时间:2007-05-25

Reasonably determining price for a couple of Bill items in bidding for Guangzhou metro
Wang Jinfang.Reasonably determining price for a couple of Bill items in bidding for Guangzhou metro[J].Railway Engineering Cost Management,2007,22(5):15-17.
Authors:Wang Jinfang
Institution:Wang Jinfang
Abstract:This article gives an introduction to the determination of unit price or lump sum price for a couple of Bill items such as excavation and backfill of earth/rock work,compensation for self-geneation of power,temporary houses and installations and the station main body enclosure structure in bidding for the Guangzhou metro project.It provides some referece possible to minimize contract risks in case the contract is awarded with a comparatively low total price winning.
Keywords:Guangzhou metro project  price of Bill items  reasonably determine
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号