首页 | 本学科首页   官方微博 | 高级检索  
     检索      

铁路客专枢纽列控地面设备布置方案研究
引用本文:徐建军.铁路客专枢纽列控地面设备布置方案研究[J].铁道通信信号,2011,47(11):9-12.
作者姓名:徐建军
作者单位:中铁第一勘察设计集团有限公司高级工程师,西安,710043
摘    要:以西安铁路客专枢纽为例,阐述了枢纽地区大型客站两场间联络线及动车走行线列控系统等级选择需考虑及解决的问题,并分析了影响等级转换应答器组设置的因素,提出了枢纽内列控系统等级选择的原则及列控地面设备设置方案,供从事铁路列控工程设计者参考。

关 键 词:列控系统  动车走行线  应答器  等级转换

Arrangement Scheme of Train Control System Wayside Equipment Within PSL Junction Region
Xu Jianjun.Arrangement Scheme of Train Control System Wayside Equipment Within PSL Junction Region[J].Railway Signalling & Communication,2011,47(11):9-12.
Authors:Xu Jianjun
Abstract:This article mainly discussed how to determine the level of train control system for the liaison lines and locomotive running tracks between the two yards within a junction region,taking Xi'an railway junction for dedicated passenger lines as an example.The author also analyzed the factors that impact the setting of balise group for train control level transition,and proposed the principles of determining the level of train control system for a junction region and the scheme of arranging wayside equipment of train control system,providing references for engineering designers engaged in railway train control system.
Keywords:Train control system  Locomotive running track  Balise  Level transition
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号