首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高原铁路隧道地段单元式道床板植筋检算
引用本文:刘启宾,魏周春,徐旸,褚卫松,赵志强.高原铁路隧道地段单元式道床板植筋检算[J].铁道勘察,2022(1):110-113.
作者姓名:刘启宾  魏周春  徐旸  褚卫松  赵志强
作者单位:陕西省铁道及地下交通工程重点实验室(中铁一院);中国铁道科学研究院集团有限公司铁道建筑研究所
基金项目:中国铁路总公司系统性重大项目(P2018G047);中铁第一勘察设计院科技开发计划项目(院科19-01)。
摘    要:某高原铁路沿线工程与环境条件复杂,正线以铺设少维护且经济性良好的双块式无砟轨道为主.为解决连续式道床板病害多、修补难度大且对基础变形适应性差等问题,拟采用单元式无砟道床结构.然而,道床结构单元化会削弱道床结构的整体稳定性,需采用植筋加强道床与隧道基础间的连接.为确保植筋设置的可靠性与经济性,基于数值分析方法对道床板与隧...

关 键 词:高原铁路  隧道地段  单元式道床板  植筋检算

Calculation of Planting Reinforcement for Unit Track Bed Slab in Tunnel Section of A Plateau Railway
Liu Qibin,Wei Zhouchun,Xu Yang,Chu Weisong,Zhao Zhiqiang.Calculation of Planting Reinforcement for Unit Track Bed Slab in Tunnel Section of A Plateau Railway[J].Railway Investigation and Surveying,2022(1):110-113.
Authors:Liu Qibin  Wei Zhouchun  Xu Yang  Chu Weisong  Zhao Zhiqiang
Institution:(Shaanxi Railway and Underground Traffic Engineering Key Laboratory(FSDI),Xi'an 710043,China;Railway Engineering Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 10081,China)
Abstract:Due to the complexed engineering and environmental conditions,twin-block ballastless track which has less maintenance and better economy are adopted for the main line of plateau railway.The unit structure is used for ballastless track bed in order to solve the problems including cracking in continuous track bed,difficulty in repairment and poor adaptability to foundation deformation.Track bed structure will be weakened because of the unit structure,and the connection between the track bed and the tunnel foundation needs to be strengthened by planting reinforcement.In order to ensure the reliability and economy of planting reinforcement,the calculation and analysis of planting reinforcement setting between the bed slab and the tunnel foundation were carried out by numerical analysis method.The results show that,based on the requirements of shear strength of planting reinforcement,local compressive strength of concrete in invert backfill layer and compressive strength of planting reinforcement glue,the number of planting reinforcement in unit track bed slab of plateau railway tunnel section should be at least 12 HRB400 reinforcement bars with diameter of 16 mm.According to the engineering and environmental characteristics of plateau railway and the requirements of cross-section layout of planting reinforcement,16 reinforcement bars were arranged for each track bed slab in general sections,and 20 for the area within 200 m of the tunnel entrances as well as the longitudinal slope of the line greater than or equal to 25‰.
Keywords:plateau railway  tunnel section  unit track bed slab  calculation of planting reinforcement
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号