首页 | 本学科首页   官方微博 | 高级检索  
     检索      

北京地铁施工阶段地质风险辨识评估及防控机制建设
引用本文:叶新丰,张 宇,刘魁刚,高亚彬,余 鹏.北京地铁施工阶段地质风险辨识评估及防控机制建设[J].都市快轨交通,2021,34(3):70-76.
作者姓名:叶新丰  张 宇  刘魁刚  高亚彬  余 鹏
作者单位:北京市轨道交通建设管理有限公司,北京100068;城市轨道交通全自动运行系统与安全监控北京市重点实验室,北京100068;北京市基础设施投资有限公司,北京 100101;中铁工程设计咨询集团有限公司,北京100055
基金项目:北京市轨道交通建设管理有限公司双创基金资助(SCJJ2020007)
摘    要:阐述地铁施工阶段地质风险特征及研究现状,结合勘察、设计、第三方监测等资料,分析可能导致事故的潜在地质因素并进行分类和辨识,提出基于风险发生概率和危害结果的PH地质风险评价方法并给出相应参考值,根据评价结果提出过程监控、加强探测和现场处置三类处理措施。基于北京市轨道交通风险管理体系,构建施工阶段地质风险动静态管控机构及工作流程,将该机制应用于北京地铁昌平线南延西土城站项目的风险管控工作,已取得良好的效果。

关 键 词:地铁施工  地质风险  风险识别  风险管控

Establishment of Geological Risk and Prevention Mechanism in Metro Construction Stage
YE Xinfeng,ZHANG Yu,LIU Kuigang,GAO Yabin,YU Peng.Establishment of Geological Risk and Prevention Mechanism in Metro Construction Stage[J].Urban Rapid Rail Transit,2021,34(3):70-76.
Authors:YE Xinfeng  ZHANG Yu  LIU Kuigang  GAO Yabin  YU Peng
Institution:Beijing MTR Construction Administration Corporation,Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit;Beijing Infrastucture Investment Co.Ltd.; China Railway Engineering Design and Consulting Group Co., Ltd.
Abstract:This paper describes the characteristics and research status of geological risk in the subway construction stage. The study also analyzes, identifies, and classifies the potential geological factors that may lead to accidents based on the geological survey data, design, and third-party monitoring. Strategies are also proposed based on the risk probability and geological hazard and risk assessment method of the pH value and corresponding reference value. Three types of treatment measures are suggested: process monitoring, strengthening detection, and onsite disposal. The risk management system of Beijing Mass Transit Railway as well as the dynamic and static control mechanisms and working processes of geological risk in the construction stage is applied to the risk management system of Xitucheng station, which is the South extension of the Changping Line of Beijing Metro. Satisfactory results were obtained.
Keywords:subway construction  geological risk  risk identification  risk management and control
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《都市快轨交通》浏览原始摘要信息
点击此处可从《都市快轨交通》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号