首页 | 本学科首页   官方微博 | 高级检索  
     检索      

城市轨道交通装配式道岔道床 设计与实践
引用本文:刘 观,鲁 彬,张光明,冯家琦.城市轨道交通装配式道岔道床 设计与实践[J].都市快轨交通,2023,36(6):29-33.
作者姓名:刘 观  鲁 彬  张光明  冯家琦
作者单位:1. 北京城建设计发展集团股份有限公司,北京 100037;2. 北京市轨道结构工程技术研究中心,北京 100037;3. 城市 轨道交通绿色与安全建造技术国家工程研究中心,北京 100037;重庆轨道四号线建设运营有限公司,重庆 404100;中铁开投重庆轨道交通建设指挥部,重庆 404100;北京兴宏信合设计咨询有限公司,北京 100037
基金项目:北京市科技计划项目(Z151100001315008);北京市科技计划项目(Z171100002117003)
摘    要:为克服现浇道岔道床岔枕离散、组装工序繁琐、工期较长及现有预制道岔道床结构复杂、施工工序多、 通用性较差的弊端,在现有预制道岔板的基础上,提出和研发一种新型的装配式道岔道床,从平面廓形、控制性 尺寸、承轨台、限位结构、隔离层或减振垫、转辙机安装预留接口等方面进行优化设计和研究创新,并在重庆轨 道交通 4 号线二期工程中成功实践。研究结果表明:与既有预制道岔道床相比,此新型装配式道岔道床的生产和 施工便利性显著增强,具有十分广泛的应用前景。

关 键 词:城市轨道交通  装配式  道岔道床  上限位  隔离层

Design and Practice of Prefabricated Turnout Bed for Urban Rail Transit
Institution:1. Beijing Urban Construction Design & Development Group Co., Ltd., Beijing 100037; 2. Beijing Engineering Research Center of Track Structure, Beijing 100037; 3. National Engineering Research Center of Green and Safe Construction Technology in Urban Rail Transit, Beijing 100037;Chongqing Metro Line 4 Construction and Operation Co., Ltd., Chongqing 404100; China Railway Development Investment, Chongqing Rail Transit Construction Headquarters, Chongqing 404100,; Beijing Xinghong Xinhe Design Consulting Co., Ltd., Beijing 100037
Abstract:A new type of prefabricated turnout bed was developed on the basis of the existing prefabricated turnout track structure to address the limitations of the existing prefabricated turnout track beds, such as discrete turnout sleepers, cumbersome assembly processes, long construction periods, complex structures, multiple construction processes, and poor universality. The study expounds on the optimized design and research innovation in terms of the plane profile, control dimension, rail bearing platform, limit structure, isolation or damping layer, and reserved interface for the installation of the switch machine. The turnout bed was successfully applied in the second phase of the Chongqing Metro Line 4 project. Compared with the existing prefabricated turnout structures, the new turnout bed demonstrated its production and construction convenience and potential for urban rail transit.
Keywords:urban rail transit  prefabricated  turnout track bed  upper limit  modified polyurethane
点击此处可从《都市快轨交通》浏览原始摘要信息
点击此处可从《都市快轨交通》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号