100m跨连续梁高支架设计与施工
引用本文:冬青.100m跨连续梁高支架设计与施工[J].铁道建筑技术,2013(9):20-25.
作者姓名:冬青
作者单位:中铁十三局集团第四工程有限公司 哈尔滨 150008
摘    要:黑石大桥第三联为66/60m+100m+66/60m变截面预应力混凝土连续箱梁,最高墩高38.5 m。为保证高墩大跨度桥梁现浇梁的施工安全与质量,支架采用螺旋钢管+贝雷桁架+碗扣式脚手架组合支架设计,通过对组合支架结构进行优化组合,确定了一个经济合理,安全可靠的支架方案。实践证明,该支架设计可为同类桥梁施工提供参考经验。

关 键 词:现浇箱梁  螺旋钢管  贝雷桁架  组合支架

100m Span Continuous Box Girder Support Frame Design and Construction
Dong Qing.100m Span Continuous Box Girder Support Frame Design and Construction[J].Railway Construction Technology,2013(9):20-25.
Authors:Dong Qing
Institution:Dong Qing (China Railway 13^th Bureau Group Co. Ltd. , Harbin 150008, China)
Abstract:The third part of Heishitou Bridge is the 66/60m + 100m + 66/60m variable cross-section prestressed concrete continuous box girder, with the highest pier 38.5m in height. In order to ensure the construction safety and quality of bridge with high pier and long span cast-in-place beam, spiral steel pipe + Bailey truss + cuplok steel tubular scaffold composite support design is used for steel support frame. By the combination optimization of structure, a safe, reliable, economical and reasonable support scheme is determined, which can provide reference experience for the similar bridge construction.
Keywords:cast-in-place box girder  spiral steel pipe  Bailey truss  composite support