摘    要:结合北京地铁八号线安德里北街站1号风道工程,对平顶直墙大断面隧道在浅埋暗挖法施工条件下的变形及其控制措施进行分析.采用有限元分析软件ANSYS分别对2种支护方案进行模拟分析.方案一:采用格栅钢架、钢筋网加喷射混凝土的初期支护措施;方案二:在方案一基础上加设大管棚和小导管注浆超前支护措施.另外,还对模拟结果与现场监测数据进行对比分析.通过分析得出:采用方案二的支护措施施工浅埋暗挖平顶直墙大断面隧道,可以控制变形量值在要求的范围内,达到安全施工的目的.

关 键 词:平顶直墙大断面隧道  浅埋暗挖  变形控制  大管棚

Deformation Control of Shallow Mining Large Section Tunnel with Horizontal Roof and Upright Wall
Zhang Zhaowei , Li Yuliang , Wu Yijun.Deformation Control of Shallow Mining Large Section Tunnel with Horizontal Roof and Upright Wall[J].Railway Construction Technology,2013(9):36-39.
Authors:Zhang Zhaowei  Li Yuliang  Wu Yijun
Institution:Zhang Zhaowei;Li Yuliang;Wu Yijun;China Railway Modern Survey & Design Institute Co. Ltd.;China Railway First Survey and Design Institute Group Co. Ltd.;
Abstract:This paper, based on No. 1 air-duct of Andeli north street station, Beijing subway line 8, analyzes the deforma- tion of large section tunnel with horizontal roof and upright wall constructed by shallow mining method. This paper simulates and analyzes two construction support programs with finite element analysis software~ Program ! took lattice girder reinforced shotcrete support measures. Program II added bassoon studio and small pipe grouting for pre-support. And it compared and analyzed simulation results and monitoring data. Through the above analysis we can conclude that the measures taken in Program II can control the deformation of large section tunnel with horizontal roof and upright wall constructed with shallow mining method within the requirements of the specification, and achieve the safe construction target.
Keywords:flat-topped straight wall section tunnel  mining method  deformation control  bassoon studio
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号