330MW机组发电机定子液压装置吊装
引用本文:张国鹏.330MW机组发电机定子液压装置吊装[J].铁道建筑技术,2010(4):86-89.
作者姓名:张国鹏
作者单位:中铁十八局集团建筑安装工程有限公司,河北高碑店,074000
摘    要:发电机定子作为汽轮发电机组中的最重单件,其吊装难度较大。以某电厂330 MW机组发电机定子吊装为实例,详细介绍GYT-200C型200 t液压提升装置在定子吊装中的使用方法,吊装程序及注意事项等。

关 键 词:发电机定子  吊装  液压提升

Cases and Analysis for 330 MW Generator Stator Hoisting
Zhang Guopeng.Cases and Analysis for 330 MW Generator Stator Hoisting[J].Railway Construction Technology,2010(4):86-89.
Authors:Zhang Guopeng
Institution:Zhang Guopeng ( China Railway 18th Bureau Group Co. Ltd. , Gaobeidian 074000, China)
Abstract:As the heaviest single piece of turbo driven set, generator stator sees a great difficulty in its hoisting. This paper takes one power plant's 330 MW generator stator hoisting as an example, and details the usage, hoisting procedures and attentions of GYT -200C 200 t hydraulic lifting device in stator hoisting.
Keywords:generator stator  hoisting  hydraulic lifting device