首页 | 本学科首页   官方微博 | 高级检索  
     检索      

公路隧道溶洞冒顶处理方案
引用本文:刘光龙.公路隧道溶洞冒顶处理方案[J].西部交通科技,2012(5):42-44.
作者姓名:刘光龙
作者单位:贵州省公路工程集团总公司第一分公司,贵州,550008
摘    要:文章根据红岩山隧道水文地质情况及冒顶塌方现场具体状况,从排水及加固角度提出了针对性的隧道溶洞坍塌冒顶处理方案,并对方案的加固处理效果进行了监控量测。监测结果证明,该方案能有效处理隧道溶洞坍塌冒顶问题。

关 键 词:公路隧道  溶洞冒顶  处理方案

Treatment Plan of Highway Tunnel Cave Roof Fall
LIU Guang-long.Treatment Plan of Highway Tunnel Cave Roof Fall[J].Western China Communication Science & Technology,2012(5):42-44.
Authors:LIU Guang-long
Institution:LIU Guang-long (No. 1 Branch of Guizhou Highway Engineering Group Corporation, Guiyang, Guizhou, 550008)
Abstract:According to the hydrogeological situation in Red Rock Mountain Tunnel and the specific actual conditions of roof fall site,from aspects of drainage and reinforcement,the article proposed the targeted treatment plan of tunnel cave collapse and roof fall, and conducted the monitoring measurement on the reinforcement treatment effect of this plan.The monitoring results showed that the plan can effectively deal with the tunnel cave collapse and roof fall problems.
Keywords:Highway tunnel  Cave roof fall  Treatment plan
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号