首页 | 本学科首页   官方微博 | 高级检索  
     检索      

鹰嘴岩隧道右线岩溶处理技术
引用本文:吴发展.鹰嘴岩隧道右线岩溶处理技术[J].公路交通技术,2014(2):89-90,96.
作者姓名:吴发展
作者单位:中铁隧道集团有限公司,河南洛阳471009
摘    要:超前地质预报有助于提前了解掌子面前方围岩结构变化及可能的地质灾害情况,制定针对性的施工对策,修正施工方案以避免险情发生。鹰嘴岩隧道右线借鉴岩溶超前预报结果,采取小导管超前支护,I18工字钢架加强支护,清除岩溶洞穴内充填物,对溶腔进行回填处理,并预留排水通道的方法,以消除隐患。

关 键 词:公路隧道  岩溶  超前地质预报  处理

Treatment Technology for Right Line Karst in Yingzuiyan Tunnel
WU Fazhan.Treatment Technology for Right Line Karst in Yingzuiyan Tunnel[J].Technology of Highway and Transport,2014(2):89-90,96.
Authors:WU Fazhan
Abstract:Advanced geological prediction contributes to understand structural changes of wall rock in front of tunnel face and possible geological disasters in advance, and to take targeted construction countermeasures and modify construction plan so as to avoid dangerous situations. For right line of Yingzuiyan Tunnel, this paper by reference to advanced prediction result adopts small duct leading support and reinforced support with I18 I-beam bracket to remove fills in karst cavities and processes karst chamber with backfilling and takes method of reserving drainage channels to eliminate hidden dangers.
Keywords:highway tunnel  karst  advanced geological prediction  process
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号