首页 | 本学科首页   官方微博 | 高级检索  
     检索      

单塔无背索斜拉桥索塔施工技术
引用本文:冯军武.单塔无背索斜拉桥索塔施工技术[J].筑路机械与施工机械化,2010,27(3):71-74,78.
作者姓名:冯军武
作者单位:中铁二十局集团第三工程有限公司,重庆,401120
摘    要:结合宝鸡市代家湾单塔无背索斜拉桥主塔的施工实践,介绍了索塔的施工工艺、索塔整体提升模板体系以及索塔线形控制等,还介绍了该工程具体的施工工况和详细的工艺流程,包括整体提升模板施工,对同类桥梁的施工具有借鉴作用。

关 键 词:斜拉桥:索塔  施工技术:工艺流程

Construction Technology of Cable Tower of Single Tower Cable-stayed Bridge with No Backstays
FENG Jun-WU.Construction Technology of Cable Tower of Single Tower Cable-stayed Bridge with No Backstays[J].Road Machinery & Construction Mechanization,2010,27(3):71-74,78.
Authors:FENG Jun-WU
Institution:FENG Jun-wu No.3 Engineering Corporation Limited of CR20G,Chongqing 401120,China
Abstract:The construction technology,overall template lifting system and linear control of cable tower are introduced in combination with the construction of single tower cable-stayed bridge with no backstays in Daijiawan of Baoji,as well as the specific construction condition and process,including the construction of template lifting of pillars,which provides reference for construction of similar bridges.
Keywords:cable-stayed bridge  cable tower  construction technology  construction process  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号