首页 | 本学科首页   官方微博 | 高级检索  
     检索      

隧道衬砌可靠指标的优化求解方法
引用本文:龚彦峰,陈文博,房倩.隧道衬砌可靠指标的优化求解方法[J].隧道建设,2018,38(8):1286-1292.
作者姓名:龚彦峰  陈文博  房倩
作者单位:(1. 中铁第四勘察设计院集团有限公司, 湖北 武汉 430063;  2. 水下隧道技术湖北省工程实验室, 湖北 武汉 430063; 3. 北京交通大学城市地下工程教育部重点实验室, 北京 100044)
基金项目:中铁第四勘察设计院集团有限公司科研项目(2016K85)
摘    要:为解决JC法计算隧道衬砌可靠指标过程中极限状态选用方法的缺陷,通过随机有限元方法和Monte-Carlo法对时速350 km高速铁路双线隧道Ⅲa、Ⅳb型衬砌进行抽样计算,得到2种衬砌各截面偏心距平均值和变异系数; 通过对素混凝土和钢筋混凝土衬砌极限状态功能函数及其适用条件的分析,引入几何优化法,以约束函数表示功能函数的约束条件,建立可靠指标的优化求解模型; 选用寻优性能良好的Global Search函数,对2种衬砌各截面可靠指标进行优化求解,并与JC法进行对比,证明优化方法的优势。

关 键 词:高速铁路双线隧道  隧道衬砌  可靠指标  极限状态函数  优化求解  
收稿时间:2018-04-16
修稿时间:2018-06-14

Research on Optimization Methods for Structural Reliability Index of Tunnel Lining
GONG Yanfeng,CHEN Wenbo,FANG Qian.Research on Optimization Methods for Structural Reliability Index of Tunnel Lining[J].Tunnel Construction,2018,38(8):1286-1292.
Authors:GONG Yanfeng  CHEN Wenbo  FANG Qian
Institution:(1. China Railway Siyuan Survey and Design Institute Group Co., Ltd., Wuhan 430063, Hubei, China; 2. Hubei Provincial Engineering Laboratory for Underwater Tunnel, Wuhan 430063, Hubei, China; 3. Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China)
Abstract:In order to solve the defects of selecting method of limit state in the process of calculating reliability indices (RI) of tunnel lining by JC method, the random finite element method and Monte Carlo method are used to sample and calculate the type Ⅲa and Ⅳb linings of 350 km/h high speed double track railway tunnel. The mean value and coefficient of variation of eccentricity of two kinds of lining sections are obtained. And then the ultimate state function and applicable conditions of plain concrete and reinforced concrete lining are analyzed; the geometric optimization method is introduced to represent the constraint conditions of ultimate state function and establish the optimization model of RI. Finally, the Global Search function with good optimization performance is used to optimize the RI of two kinds of lining sections, and also it is compared with JC method to prove the advantages of the optimization method.
Keywords:high speed double track railway tunnel  tunnel lining  reliability index  ultimate state function  optimization solution
本文献已被 CNKI 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号