首页 | 本学科首页   官方微博 | 高级检索  
     检索      

深圳某大型土石方工程施工设备配套
引用本文:何振国.深圳某大型土石方工程施工设备配套[J].隧道建设,2006,26(5):79-81,96.
作者姓名:何振国
作者单位:中铁隧道集团第一工程处
摘    要:根据深圳大型土石方工程的内容介绍了土石方工程的设备配套计算方法。主要论述了钻孔设备、挖装机械、运输设备的配套原则和计算方法,并结合现行公路和市政预算定额,对配套方案的生产能力进行了对比分析。优化工程设备配套是以机械化施工为主的工程项目提高生产效率和节约工程成本的关键。

关 键 词:大型  土石方  设备配套
收稿时间:2005-08-22
修稿时间:2005-08-222006-07-20

Construction Equipment Matching of a Large-scale Earth/rock Engineering Works in Shenzhen
HE Zhen-guo.Construction Equipment Matching of a Large-scale Earth/rock Engineering Works in Shenzhen[J].Tunnel Construction,2006,26(5):79-81,96.
Authors:HE Zhen-guo
Institution:No.1 Division of China Railway Tunnel Group Co., Ltd.
Abstract:Taking a large-scale earth/rock engineering works in Shenzhen as an example, the paper presents the calculation method for the equipment matching of an earth/rock engineering works. The paper places its emphasis on the expatiation of the matching principle and calculation method for the drilling equipment, excavating and loading equipment and transportation equipment. Furthermore, the paper makes comparisons between the production capability of the adopted matching scheme and tile quota data specified in the highway budget and municipal budget. The optimization of the equipment matching is of fundamental importance for the project to improve its production efficiency and reduce its engineering cost.
Keywords:large-scale  earth/rock engineering work  equipment matching
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号