长春地铁解放大路站基于三维数值模拟的地铁车站施工工法优化分析
引用本文:戴文亭,武皓,孙明志,郝佰洲,曹耀兮.长春地铁解放大路站基于三维数值模拟的地铁车站施工工法优化分析[J].隧道建设,2016,36(1):12-19.
作者姓名:戴文亭  武皓  孙明志  郝佰洲  曹耀兮
作者单位:(吉林大学交通学院, 吉林长春 130022)
基金项目:吉林大学横向课题(3R1133142417)
摘    要:为了对地铁车站施工工法进行优化分析,依托长春地铁解放大路站工程,采用数值模拟方法建立数值模型,从中轴线上方地表沉降、拱顶沉降和拱顶应力3方面对6导洞PBA工法、8导洞PBA工法以及一次扣拱暗挖逆作法进行了对比分析,得到: 1)在施工过程中,3种工法的中轴线上方地表沉降、拱顶沉降和拱顶应力变化规律存在明显差异; 2)通过综合对比分析,一次扣拱暗挖逆作法最优,6导洞PBA工法最差。得到的对比分析结果对现场施工具有指导意义。

关 键 词:地铁车站  施工工法  6导洞PBA工法  8导洞PBA工法  一次扣拱暗挖逆作法  数值模拟  FLAC3D  地表沉降  拱顶沉降  拱顶应力
收稿时间:2015-07-02

Optimization of Construction Methods for Jiefanglu Station of Changchun Metro Using Three-dimensional (3D)Numerical Simulations
DAI Wenting,WU Hao,SUN Mingzhi,HAO Baizhou,CAO Yaoxi.Optimization of Construction Methods for Jiefanglu Station of Changchun Metro Using Three-dimensional (3D)Numerical Simulations[J].Tunnel Construction,2016,36(1):12-19.
Authors:DAI Wenting  WU Hao  SUN Mingzhi  HAO Baizhou  CAO Yaoxi
Institution:(School of Transportation, Jilin University, Changchun 130022, Jilin, China)
Abstract:In this paper, comparison and contrast is made among three constructions methods, i.e., 6 pilot PBA method, 8 pilot PBA method, and cast in situ arch and cut and cover top down method, in terms of ground surface settlement above tunnel axial line, crown settlement and crown stress. The numerical simulation model of Jiefanglu Station of Changchun Metro is established, so as to analyze the optimization of construction method. The study results show that: 1) The ground surface settlement above the tunnel axial line, crown settlement and crown stress of the three construction methods are different; 2) The cast in situ arch and cut and cover top down method is superior to 6 pilot PBA method and 8 pilot PBA method for this project, and the 6 pilot PBA method is the worst. The results achieved can provide reference for construction of similar projects in the future.
Keywords:Metro station  construction method  6 pilot PBA method  8 pilot PBA method  one time cast in situ arch and cut and cover top down method  numerical simulation  ground surface settlement  crown settlement  crown stress