首页 | 本学科首页   官方微博 | 高级检索  
     检索      

小半径曲线管幕修建暗挖地铁车站技术研究
引用本文:李洋,程鹏,李鹏,王宁,罗长明,毕程程.小半径曲线管幕修建暗挖地铁车站技术研究[J].隧道建设,2022,42(7):1207-1218.
作者姓名:李洋  程鹏  李鹏  王宁  罗长明  毕程程
作者单位:(中铁工程装备集团有限公司地下空间设计研究院, 河南 郑州 450016)
摘    要:为研究曲线管幕施工暗挖地铁车站的关键技术,采用理论计算、数值模拟和现场试验的方法,从设计和施工2方面进行研究,给出曲线管幕施工过程中顶推力的计算公式,计算得出曲线管幕设备所需顶推力范围; 提出曲线顶管姿态与轴线控制措施; 得到曲线管幕施工地铁车站对周围地层的影响规律; 对曲线管幕的始发装置、导向装置及顶推力计算的合理性和适用性进行论证。

关 键 词:曲线管幕    暗挖地铁车站    最大顶推力    纠偏系统    姿态控制  

Research on Construction Technology for Small Radius Curved Pipe Curtain Mined Metro Stations
LI Yang,CHENG Peng,LI Peng,WANG Ning,LUO Changming,BI Chengcheng.Research on Construction Technology for Small Radius Curved Pipe Curtain Mined Metro Stations[J].Tunnel Construction,2022,42(7):1207-1218.
Authors:LI Yang  CHENG Peng  LI Peng  WANG Ning  LUO Changming  BI Chengcheng
Institution:(Underground Space Research and Design Institute, China Railway Engineering Equipment Group Co.,  Ltd., Zhengzhou 450016, Henan, China)
Abstract:To investigate the key construction technologies of curved pipe curtain mined metro stations, theoretical calculation, numerical simulation, and field test methods are employed to study the design and construction of these stations. The conclusions drawn are as follows: (1) The calculation formula of the jacking force in the construction process of the curved pipe curtain is obtained, and the jacking force range required for the curved pipe curtain equipment is calculated. (2) Attitude and axis control measures are proposed. (3) The influence law of curved pipe curtain construction of the metro stations on the surrounding environment is obtained. (4) The rationality and applicability of the launching device, guiding device, and jack force calculation of the curved pipe curtain are demonstrated.
Keywords:curved pipe curtain  mined metro station  maximum  jacking force  deviation correction system  attitude control  
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号