首页 | 本学科首页   官方微博 | 高级检索  
     检索      

满堂支架法施工中主梁立模监控预抬值的确定
引用本文:佟泽民.满堂支架法施工中主梁立模监控预抬值的确定[J].内蒙古公路与运输,2008(5).
作者姓名:佟泽民
作者单位:通辽市交通工程局,内蒙古,通辽,028000
摘    要:通过采用合适的支架预压监控方法,为施工提供可靠的主梁施工监控预抬值,从而在保证桥梁施工安全及主梁线形满足设计要求的同时,达到缩短施工周期,取得很好效果,对满堂支架法施工的同类型桥梁具有借鉴意义。

关 键 词:满堂支架  施工监控  主梁立模监控预抬值  确定方法

Determination of pro-raising height for monitoring the main girders with full-frame method
TONG Ze-min.Determination of pro-raising height for monitoring the main girders with full-frame method[J].Highways & Transportation in Inner Mongolia,2008(5).
Authors:TONG Ze-min
Institution:TONG Ze-min
Abstract:The suitable pre-compressive method for monitoring is used to provide for construction with a reliable value of pre-raising height for monitoring the main girders,thus reducing the construction time and making better result while ensuring the safety of bridge construction and to meet the requirements for the alignment of the bridge alignment.Also,it is of significance for the similar bridges with full-frame construction method.
Keywords:full-frame method  construction monitor  pre-raising height for monitoring the main girder  determination
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号