首页 | 本学科首页   官方微博 | 高级检索  
     检索      

先张法预应力筋放张的施工技术
引用本文:邓凤学.先张法预应力筋放张的施工技术[J].城市道桥与防洪,2008(2):56-58.
作者姓名:邓凤学
作者单位:广州大学土木工程学院,广东广州,510006
摘    要:梅河高速公路和景鹰高速公路桥梁上部构造为先张法预应力混凝土空心板,采用预制场集中预制。该文以上述两条高速公路空心板预应力放张施工为实例,从放张前后钢绞线的受力原理着手,论述了预应力放张的施工技术。

关 键 词:预应力筋  先张法  放张  施工技术
文章编号:1009-7716(2008)02-0056-02
收稿时间:2007-06-08
修稿时间:2007年6月8日

Construction Technology of Pre-stressed Steel Tensioning by Pre-tensioning Process
Deng Fengxue.Construction Technology of Pre-stressed Steel Tensioning by Pre-tensioning Process[J].Urban Roads Bridges & Flood Control,2008(2):56-58.
Authors:Deng Fengxue
Abstract:The superstructures of the bridges on Meihe Expressway and Jingyin Expressway are the pre-tensioning pre-stressed concrete hollow slabs which are centralized to prefabricate in the prefabrication fields.Taking the pre-stressing tensioning construction of the hollow slabs for the above two expressways as the practical example,starting with the bearing principle of the steel strand cable before and after tensioning,the article discusses the pre-stressing tensioning construction technology.
Keywords:pre-stressed steel  pre-tensioning process  tensioning  construction technology  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号