首页 | 本学科首页   官方微博 | 高级检索  
     检索      

深圳地铁3号线施工中管线迁改设计
引用本文:孟凡良,徐辉.深圳地铁3号线施工中管线迁改设计[J].城市道桥与防洪,2011(11):117-119,153.
作者姓名:孟凡良  徐辉
作者单位:深圳市市政设计研究院有限公司,广东深圳,518029
摘    要:结合深圳市地铁3号线西延段工程中管线迁改的设计体会,总结了管线迁改的总体思路和一般原则,并以少年宫站为例详细论述了管线迁改的具体实施方案。

关 键 词:深圳市  地铁  管线迁改  交通输解

Design in Pipeline Removal and Reconstruction of Shenzhen Metro No.3 Line Project
Meng Fanliang, Xu Hui.Design in Pipeline Removal and Reconstruction of Shenzhen Metro No.3 Line Project[J].Urban Roads Bridges & Flood Control,2011(11):117-119,153.
Authors:Meng Fanliang  Xu Hui
Institution:Meng Fanliang, Xu Hui
Abstract:The article sums up the master thought and the general principle of pipeline removal and reconstruction according to the design experience of the pipeline removal and construction in Shenzhen Metro No. Line West Extension Project, and discusses the detail implementing scheme of pipeline removal and reconstruction by the example of Children’s Palace Station.
Keywords:Shenzhen  metro  pipeline removal and reconstruction  traffic transportation solution
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号