首页 | 本学科首页   官方微博 | 高级检索  
     检索      

隧道盾构机进出洞施工技术
引用本文:赵峻,戴海蛟.隧道盾构机进出洞施工技术[J].城市道桥与防洪,2007(9):62-67.
作者姓名:赵峻  戴海蛟
作者单位:上海隧道工程股份有限公司,上海市,200082
摘    要:盾构的进出洞工序是盾构法建造隧道的关键工序。该文阐述了盾构进出洞施工的重要性,介绍了稳定正面土体、基座及后座的设置、洞口间隙的密封等施工技术。

关 键 词:盾构  进出洞  施工技术
文章编号:1009-7716(2007)09-0062-06
收稿时间:2007-07-15

Tunnel Shield Machine Driving-in and Driving-out Construction Technique
Zhao Jun,Dai Haijiao.Tunnel Shield Machine Driving-in and Driving-out Construction Technique[J].Urban Roads Bridges & Flood Control,2007(9):62-67.
Authors:Zhao Jun  Dai Haijiao
Abstract:The driving-in and driving-out procedure of the shield is the key procedure of the shield tunneling method to construct the tunnel. The article sets forth the significance of the shield driving-in and driving-out construction,and introduces the construction technique of stabilizing the front soil body,setting up the base and backseat and sealing the opening gap.
Keywords:shield  driving in and driving out  construction technique
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号