首页 | 本学科首页   官方微博 | 高级检索  
     检索      

葑溪大桥施工控制
引用本文:孙小猛,闫子才,朱大勇,赵飞.葑溪大桥施工控制[J].桥梁建设,2012,42(2):92-97.
作者姓名:孙小猛  闫子才  朱大勇  赵飞
作者单位:1. 中铁四局博士后工作站,安徽合肥230023;合肥工业大学土木与水利工程学院博士后流动站,安徽合肥230009
2. 中铁四局博士后工作站,安徽合肥,230023
3. 合肥工业大学土木与水利工程学院博士后流动站,安徽合肥,230009
4. 中铁四局第二工程有限公司,江苏 苏州,215131
摘    要:为了保证葑溪大桥的施工安全和质量,根据预应力混凝土斜拉桥悬臂浇筑和支架现浇非对称施工特点,建立施工控制计算模型,探讨影响主梁线形及斜拉索索力的因素,并制定相应控制措施,对主梁线形、内力、索力、牵索挂篮应力和变形进行有效监控.施工控制结果表明:成桥状态下,主桥轴线实测标高、桥梁应力状态、成桥索力均满足设计要求,挂篮在施工过程中的应力状态及变形情况与试验变化趋势基本一致.

关 键 词:斜拉桥  施工监控  悬臂灌筑架桥  支架  应力  变形

Construction Control of Fengxi Bridge
SUN Xiao-meng , YAN Zi-cai , ZHU Da-yong , ZHAO Fei.Construction Control of Fengxi Bridge[J].Bridge Construction,2012,42(2):92-97.
Authors:SUN Xiao-meng  YAN Zi-cai  ZHU Da-yong  ZHAO Fei
Institution:1.Post-Doctoral Working Station,China Railway Siju Civil Engineering Group Co.,Ltd.,Hefei 230023,China; 2.Post-Doctoral Research Station,School of Civil Engineering,Hefei University of Technology,Hefei 230009, China;3.The 2nd Engineering Co.,Ltd.,China Railway Siju Civil Engineering Group,Suzhou 215131,China)
Abstract:To ensure the construction safety and quality of the Fengxi Bridge,a prestressed concrete cable-stayed bridge and in the light of the asymmetric construction characteristics of cantilever casting and casting of the bridge on scaffolding,a calculation model for the construction control of the bridge was established,the factors having influences on the geometric shape of the main girder and on the stay cable forces of the bridge were studied and the corresponding measures were formulated for the effective monitoring and control of the geometric shape and internal forces of the main girder,the stay cable forces and the stress and deformation of the guyed form travelers.The results of the construction control show that in the state of the completed bridge,the measured elevation of the axis of the main bridge,the stress conditions and the stay cable forces can all accord with the design requirements and the stress conditions and deformation of the guyed form travelers in the construction process are basically identical to the change tendency of the stress and deformation in the testing.
Keywords:cable-stayed bridge  construction monitoring and control  cantilever casting of bridge  scaffolding  stress  deformation
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号