水南特大桥98 m长挖孔桩施工
引用本文:贺建端.水南特大桥98 m长挖孔桩施工[J].桥梁建设,2007(1):64-66,69.
作者姓名:贺建端
作者单位:中铁五局二公司,湖南,衡阳,421002
摘    要:湖北沪蓉西高速公路水南特大桥右幅8号墩桩长98 m,所处地址条件复杂,岩石破碎、岩溶尤为强烈,发育成古岩漏斗。根据实际情况采用挖孔桩施工,介绍施工方法及各项特殊措施,为类似工程提供参考。

关 键 词:挖孔桩  护壁  桥梁施工
文章编号:1003-4722(2007)01-0064-03
修稿时间:2006-08-01

Construction of 98 m Long Dug Piles of Shuinan Bridge
HE Jian-duan.Construction of 98 m Long Dug Piles of Shuinan Bridge[J].Bridge Construction,2007(1):64-66,69.
Authors:HE Jian-duan
Institution:The 2nd Engineering Co., Ltd., China Railway Tiewuju Civil Engineering Group, Hengyang 421002, China
Abstract:The piles of Pier No.8 of the right deck of Shuinan Bridge on the west section of Shanghai-Chengdu Expressway in Hubei Province are 98 m long.The geologic conditions at the site where the piles are located are complicated,that is,the rock foundation there is rupture,the karst geology is particularly prominent and has grown into fossil rock hopper and in accordance with the conditions at the site,the piles were constructed by digging method.In this paper,the construction methods and various special measures adopted in the construction of the piles are presented.It is expected that the presentations in the paper may serve as reference to the construction of similar works.
Keywords:dug pile  lagging  bridge construction