地铁隧道盾构法施工全过程风险分析
引用本文:张姣,贾敏才,张建.地铁隧道盾构法施工全过程风险分析[J].中南公路工程,2013(3):38-41,56.
作者姓名:张姣  贾敏才  张建
作者单位:[1]上海城市管理职业技术学院土木工程与交通学院,上海200432 [2]同济大学地下建筑与工程系,上海200092 [3]中铁第四勘察设计院集团有限公司,湖北武汉430063
基金项目:国家自然科学基金面上课题(40972214)
摘    要:由于地铁隧道盾构法施工工程中勘察、设计、施工等方面存在大量的风险因素,其不确定性、复杂性都增加了风险分析的难度,一般的风险分析方法不能较好地评估地铁隧道盾构法施工工程风险。本文提出了基于模糊综合分析的地铁隧道盾构施工风险评估方法,以初步统计的地铁隧道盾构法工程质量安全事故数据和专家调研数据为基础,首先构建地铁隧道盾构法施工的风险清单,然后采用模糊对数概率和模糊对数损失率的概念对风险事件进行定量分析,再求出风险事件的风险值及风险等级隶属度,最后确定地铁隧道盾构法施工工程的总体和每个风险事件的风险等级,该方法的结果与上海市地铁隧道盾构法施工风险水平现状相一致评,其结果可为下一步风险预防和控制提供科学依据。

关 键 词:地铁隧道盾构法施工  模糊综合评估法  风险分解结构  风险分析

Analysis of Risks in Overall Process during the Construction Period of Metro Shield Tunnel Construction
ZHANG Jiao,JIA Mincai,ZHANG Jian.Analysis of Risks in Overall Process during the Construction Period of Metro Shield Tunnel Construction[J].Central South Highway Engineering,2013(3):38-41,56.
Authors:ZHANG Jiao  JIA Mincai  ZHANG Jian
Institution:1.School of Civil Engineering and Transportation,Shanghai Technical College of Urban Management,Shanghai,200432,China;2.Department of Geotechnical Engineering,Tongji University,Shanghai,200092 China;3.China Railway Si Yuan Survey and Design Group Co.Ltd.,Wuhan,430063,China)
Abstract:Because a large number of risk factors existed in the reconnaissance,design and construction of metro shield tunneling as well as their uncertainties and the complexities complicate the difficulties of risk analysis,common methods of analyzing risks cannot serve the assessment of metro shield tunnel construction better.The paper puts forward the method to assess metro shield tunnel construction based on the Fuzzy Synthetic Evaluation.It,in the basis of initially collected data of quality safety of metro shield tunnel construction and researches conducted by experts,firstly,builds the risk lists of metro shield tunnel construction;secondly,conducts quantitative analysis of risk events with the concept of fuzzy logarithm probability and fuzzy logarithm loss rate;thirdly,seeks value-at-risk of risk events and risk level membership;finally,determines the risk level of each risk event and the overall risk level of metro shield tunnel construction.The result,making use of the method,is consistent with the risk level of Shanghai metro shield tunnel,which provides scientific proof for further risk prevention and control.
Keywords:metro shield construction  Fuzzy Synthetic Evaluation  risk breakdown structure  risk analysis