蒸汽发生器的RELAP5仿真分析
引用本文:陈国伟,唐胜利,吴小飞.蒸汽发生器的RELAP5仿真分析[J].机电设备,2009,26(5):23-26.
作者姓名:陈国伟  唐胜利  吴小飞
作者单位:重庆大学,动力工程学院,重庆,400044
摘    要:蒸汽发生器是连接一、二回路的枢纽,是核电系统中的最大的换热设备,既承受一回路工作条件(高温、高压、放射性等),也承受二回路工作条件的影响,因此带来了运行和安全的复杂性.本文选用轻水反应堆(LWR)瞬态分析程序REIAP5,针对额定工况下,对巴基斯坦恰希玛核电站的蒸汽发生器进行模拟,得到了良好的仿真结果.

关 键 词:蒸汽发生器  RELAP5  CHASHMA核电站  仿真

Simulation of the steam generation in RELAP5.0
CHEN Guo-wei,TANG Sheng-li,WU Xiao-fei.Simulation of the steam generation in RELAP5.0[J].Mechanical and Electrical Equipment,2009,26(5):23-26.
Authors:CHEN Guo-wei  TANG Sheng-li  WU Xiao-fei
Institution:College of Power Engineering;Chongqing University;Chongqing 400044;China
Abstract:Steam generator is the biggest heat exchanger in nuclear power plant,which is the linchpin between primary circuit and secondary circuit.It bear primary circuit working conditions(temperature,pressure,radiation,etc),but also under the secondary circuit working conditions,so bring the complexity of operation and safety.We take advantage of the RELAP5.0 code,which is a light-water reactor(LWR)transient analysis program to simulate the steam generator of Pakistan's Chashma nuclear power plant on the rated cond...
Keywords:RELAP5