首页 | 本学科首页   官方微博 | 高级检索  
     检索      

38000 DWT杂货船轴系方案比较分析
引用本文:戴益民.38000 DWT杂货船轴系方案比较分析[J].船海工程,2014(3):116-119.
作者姓名:戴益民
作者单位:泰州口岸船舶有限公司,江苏泰州225321
摘    要:以38 000 DWT杂货船推进轴系为研究对象,比较分析艉管有前、后轴承和艉管仅有后轴承两种轴系布置方案下各轴承负荷、垂直位移等变化,特别是SMCR工况下轴承负荷的分布情况。结果表明:仅有后轴承,并将中间轴承后移,能够更好地改善轴系运行状态。

关 键 词:轴系校中  轴承负荷  艉管前轴承

Comparative Analysis of Propulsion Shafting Arrangement for the 38 000 DWT Bulk Carrier
Authors:DAI Yi-min
Institution:DAI Yi-min (Taizhou Kou'an Shipbuilding Co. Ltd. , TaiZhou Jiangsu 225321, China)
Abstract:The 38 000 DWT bulk carrier propulsion shafting was taken as the research objection .For the two kinds of ar-rangement of the propulsion shafting system , one has fore and after stern tube bearing and the other only has after stern tube bear -ing, the bearing load and vertical displacement of bearing were compared , especially the bearing load distribution when main en-gine running at SMCR .The results showed that cancelling the fore stern tube bearing , and shift the intermediate bearing aft , it can improve the system running condition .
Keywords:shafting alignment  bearing load  fore stern-tube bearing
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号