首页 | 本学科首页   官方微博 | 高级检索  
     检索      

珠澳口岸人工岛水泥搅拌桩施工质量控制
引用本文:李连明,周宇.珠澳口岸人工岛水泥搅拌桩施工质量控制[J].中国港湾建设,2014(6):45-47.
作者姓名:李连明  周宇
作者单位:广州南华工程管理有限公司,广东广州510230
摘    要:结合港珠澳大桥珠澳口岸人工岛西北护岸水泥搅拌桩施工,简述水泥搅拌桩施工质量控制要点和方法。水泥搅拌桩施工质量控制的关键为水泥搅拌机型的选择、水泥品牌的选用、水泥掺入量和每延米用量的选配、桩位、桩径和垂直度的控制、施工参数的确定。

关 键 词:水泥搅拌桩  施工质量控制  要点和方法

Cement mixing pile construction quality control of the Zhuhai-Macao Port artificial island
LI Lian-ming,ZHOU Yu.Cement mixing pile construction quality control of the Zhuhai-Macao Port artificial island[J].China Harbour Engineering,2014(6):45-47.
Authors:LI Lian-ming  ZHOU Yu
Institution:( Guangzhou Nanhua Project Management Co., Ltd., Guangzhou, Guangdong 510230, China )
Abstract:Combined with the cement mixing pile construction of the northwest revetment of the artificial island in the HZMB, this paper describes the construction quality control points and methods of cement mixing piles. The key points for the quality control are the selection of cement mixer types, the selection of cement brands, the cement content, the matching amount per linear meter, the control of pile location, pile diameter and the vertical degree, construction parameters , and the determination of construction parameters.
Keywords:cement mixing pile  construction quality control  elements and methods
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号