首页 | 本学科首页   官方微博 | 高级检索  
     检索      

既有结构下基桩完整性检测的桩侧激振接收法
引用本文:高飞.既有结构下基桩完整性检测的桩侧激振接收法[J].中国港湾建设,2012(1):29-31.
作者姓名:高飞
作者单位:[1]上海中九工程检测有限公司,上海200437 [2]中国船舶工业第九设计研究院,上海200063
摘    要:对于既有结构下基桩的完整性检测,传统反射波法的激振接收方式不再适用。文中详细介绍了桩侧激振接收法的基本原理、现场检测、信号分析等内容,可以较好地进行既有结构下基桩完整性检测,为相关工程技术人员提供参考。

关 键 词:既有结构  基桩完整性检测  桩侧激振接收法。

Reception of Pile-side Excited Vibration to Test Pile Integrity Testing for Existing Structures
GAO Fei.Reception of Pile-side Excited Vibration to Test Pile Integrity Testing for Existing Structures[J].China Harbour Engineering,2012(1):29-31.
Authors:GAO Fei
Institution:GAO Fei ( 1. Shanghai NDRI Engineering Testing Co., Ltd., Shanghai 200437, China; 2. The Ninth Design & Research Institute of CSSC, Shanghai 200063, China )
Abstract:For pile integrity testing for existing structures, the traditional method of reflected waves is no longer applicable. The fundamental principles, field tests and signal analysis of vibration excitation on pile-side are described in detail, which can be well used to test the pile integrity for existing structures, thus providing reference for technical personnel.
Keywords:existing structure  pile integrity testing  reception of pile-side excited vibration
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号