首页 | 本学科首页   官方微博 | 高级检索  
     检索      

黄浦江航道维护中的长航道乘潮水位计算
引用本文:夏 军,施友仁.黄浦江航道维护中的长航道乘潮水位计算[J].水运工程,2019(5):109-113.
作者姓名:夏 军  施友仁
作者单位:中交上海航道勘察设计研究院有限公司,上海 200120,上海市码头(航道)管理中心,上海 200120
基金项目:国家重点研发计划资助项目(2017YFC0405405)
摘    要:黄浦江为感潮河段长航道,与其他类似航道相比,黄浦江还存在港区集中、船舶进口时间不一且并非在最优乘潮时间之后即靠泊码头的特点。针对上述问题,对进港时间与乘潮历时的相关关系进行研究,采用多站水位联合计算的方式,提出以进口时间作为限制条件,根据具体进口时间(潮时)推算航行到各航段所对应时间(潮时),并结合单站涨落潮时间与船舶过站时间的数学关系,进而计算需乘潮历时和可能乘到的潮位的方法。通过该方法的计算,在进口时间受限的情况下,可得到船舶靠泊各个港区所需的最佳乘潮时间和对应的乘潮水位,并以此分别确定航道各段的维护高程,合理利用有限资源,减少工程投资。

关 键 词:乘潮水位  乘潮历时  多站联合计算  黄浦江  航道维护

Calculation of riding high tide level in a long waterway in the Huangpu River channel maintenance
XIA Jun and SHI You-ren.Calculation of riding high tide level in a long waterway in the Huangpu River channel maintenance[J].Port & Waterway Engineering,2019(5):109-113.
Authors:XIA Jun and SHI You-ren
Institution:Shanghai Waterway Engineering Design and Consulting Co.,Ltd.,Shanghai 200120,China and Shanghai Terminal (Navigation Channel) Administrative Authority,Shanghai 200120,China
Abstract:The Huangpu River is a long channel in tidal river.Compared with other similar channels,the Huangpu River also has the characteristics of concentrated port area,varied time of ship entrance and not berthing at the optimal time of tide.For the above problems,we research the relationship between import time and duration of tide by the method of multi-station water level combined calculation.Taking import time as the constraint condition,we calculate the corresponding time from voyage to each section(tidal time)according to the specific import time(tidal time).Combined with the mathematical relation between the time of rising and falling tide of a single station and the time of passing the station,we calculate the tide duration and the riding high tide level.Through the calculation of this method,under the condition of limited import time,the optimal tidal time and the corresponding riding high tide level required for vessels to dock at each port area can be obtained,and then the maintenance elevation of each section of the channel can be determined respectively.This method can make rational use of limited resources and reduce project investment.
Keywords:riding high tide level  duration of tide  multi-station combined calculation  the Huangpu River  channel maintenance
本文献已被 CNKI 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号