湘江近尾洲二线船闸下游引航道口门区通航水流条件改善措施
引用本文:祁永升,许光祥,许锡宾,刘志敏,王 定.湘江近尾洲二线船闸下游引航道口门区通航水流条件改善措施[J].水运工程,2021(3):126-131.
作者姓名:祁永升  许光祥  许锡宾  刘志敏  王 定
作者单位:重庆交通大学 河海学院,重庆 400074;重庆交通大学 河海学院,重庆 400074;国家内河航道整治工程技术研究中心,重庆400074;湖南省交通规划勘察设计院有限公司,湖南 长沙410008
摘    要:湘江近尾洲枢纽二线船闸为升级改造工程,位置和轴线没有选择余地,下游引航道口门区的通航水流条件只能依靠优化开闸方式或修建导流墩来改善。采用1∶100定床正态河工物理模型试验,在充分认识常规开闸泄流方式下游引航道口门区水流条件的基础上,通过多种开闸泄流方式的组合试验以及导流墩布置数量、间距、角度等优化试验,提出常规开闸+边孔补流的泄流方式,或布设单墩长度20 m、走向与航线平行、间距20 m的3个导流墩,均可将通航流量提高到2 a一遇洪水标准。

关 键 词:口门区  泄水闸  河工试验  导流墩  通航水流条件

Measures of improving navigable flow conditions in entrance area of downstream approach channel of Jinweizhou second-line ship lock in the Xiangjiang River
QI Yong-sheng,XU Guang-xiang,XU Xi-bin,LIU Zhi-min,WANG Ding.Measures of improving navigable flow conditions in entrance area of downstream approach channel of Jinweizhou second-line ship lock in the Xiangjiang River[J].Port & Waterway Engineering,2021(3):126-131.
Authors:QI Yong-sheng  XU Guang-xiang  XU Xi-bin  LIU Zhi-min  WANG Ding
Institution:(College of River and Ocean Engineering,Chongqing Jiaotong University,Chongqing 400074,China;National Engineering Research Center for Inland Waterway Regulation,Chongqing 400074,China;Hunan Provincial Communications Planning,Survey&Design Institute Co.,Ltd.,Changsha 410008,China)
Abstract:The second-line ship lock of Jinweizhou Junction in Xiangjiang is an upgrade and reconstruction project. There is no choice of location and axis. The navigational flow conditions in the entrance area of the downstream approach channel can only be improved by optimizing the opening method or constructing a diversion pier. Using 1∶100 fixed-bed normal river physics model test, on the basis of fully understanding the water flow conditions of the downstream approach channel entrance area of the conventional gate discharge method,through a combination of multiple-gate discharge methods and diversion pier layout optimization experiments such as number,spacing,angle,etc.,we propose the conventional way of opening gate + side hole supplementary discharge,or the arrangement of three diversion piers with a single pier length of 20 m,a direction parallel to the route,and a spacing of 20 m. Both can be opened to the traffic flow increased to a flood in 2 years.
Keywords:entrance area  sluice gate  river test  diversion pier  navigable flow condition