高应变法确定大直径混凝土管桩的承载力
引用本文:刘永锋.高应变法确定大直径混凝土管桩的承载力[J].水运工程,2005(9):23-25,40.
作者姓名:刘永锋
作者单位:广州四航工程技术研究院,广东,广州,510230
摘    要:在缺少大直径混凝土管桩静载试验的情况下,现在普遍采用了动测试桩的方法确定大管桩承载力。文中提出采用CASE法和CAPWAPC法相互比较来确定大管桩承载力的方法。

关 键 词:大管桩  动测试桩  桩承载力
文章编号:1002-4972(2005)09-0023-03
收稿时间:2005-05-18
修稿时间:2005-05-18

Determination of Bearing Capacity of Large-Diameter Concrete Pipe Pile Using High-Strain Dynamic Pile Testing Method
LIU Yong-feng.Determination of Bearing Capacity of Large-Diameter Concrete Pipe Pile Using High-Strain Dynamic Pile Testing Method[J].Port & Waterway Engineering,2005(9):23-25,40.
Authors:LIU Yong-feng
Institution:Guangzhou Sihang Institute of Engineering Technology, Guangzhou 510230, China
Abstract:Since few static tests are carried out to determine the capacity of large- diameter concrete pipe pile, dynamic pile test method is widely used to determine its bearing capacity. This paper introduces the CASE and CAPWAPC methods, and proposes to determine the pile bearing capacity by referring the capacities determined by the twomethods.
Keywords:large-diameter concrete pile  dynamic pile testing  pile bearingcapacity  