长江口北槽深水航道整治工程贮泥坑抛泥过程监测分析*
引用本文:戚定满,王元叶,万远扬.长江口北槽深水航道整治工程贮泥坑抛泥过程监测分析*[J].水运工程,2013(11):43-48.
作者姓名:戚定满  王元叶  万远扬
作者单位:上海河口海岸科学研究中心,上海 201201;上海河口海岸科学研究中心,上海 201201;上海河口海岸科学研究中心,上海 201201
基金项目:交通运输重大科技专项(2011328A0670),国家自然科学基金面上项目(51279134);交通运输部科技项目(2012329A0640)
摘    要:对北槽航道维护使用的3#贮泥坑抛泥流失率进行现场监测和分析研究。监测内容包括应用多波束地形测量仪测 得贮泥坑抛吹泥前后的准确容积变化,采用表层取样法测量贮泥坑抛泥后的表层泥沙密度及采用柱状采样器测量贮泥坑不 同深度的泥沙密度,综合容积变化和密度结果可以得到实际入坑泥沙量,结合实际抛泥量计算出贮泥坑的抛泥流失率。监 测结果表明该贮泥坑的抛泥流失率达到76%。同步监测的流速结果表明贮泥坑周边动力强、流速快,流速快是造成该贮泥 坑抛泥流失率大的主要原因。建议该坑向附近动力弱的坝田掩护区移动以减少该贮泥坑泥沙流失率。

关 键 词:长江口  北槽深水航道整治工程  贮泥坑  流失率  柱状采样

Field measurement for dumped sediment transport at disposal zone of the Yangtze estuary deep navigation regulation project
QI Ding-man,WANG Yuan-ye and WAN Yuan-yang.Field measurement for dumped sediment transport at disposal zone of the Yangtze estuary deep navigation regulation project[J].Port & Waterway Engineering,2013(11):43-48.
Authors:QI Ding-man  WANG Yuan-ye and WAN Yuan-yang
Institution:Shanghai Estuarine and Coastal Science Research Center, Shanghai 201201, China;Shanghai Estuarine and Coastal Science Research Center, Shanghai 201201, China;Shanghai Estuarine and Coastal Science Research Center, Shanghai 201201, China
Abstract:Dumped sediment transport at the dredge disposal site in the north passage of the Yangtze estuary is studied by field measurement. The volume of dredge disposal zone is obtained by multi-beam sonar. The density of surface is measured by sampler-collection and the density of different level is measured by stationary-piston sampler. The sediment loss ratio from the disposal zone can be calculated by the volume of dredge disposal zone and the total disposal dredge of the self-propelled trailing suction hopper dredgers. The result shows that the sediment loss ratio is about 76%. The flow velocity obtained by flow-measure- system is so big that much sediment can be carried out of the disposal zone, which can be used to explain the sediment loss ratio. The location of dredge disposal zone should be moved to the middle section of dams for reducing the sediment loss ration.
Keywords:the Yangtze estuary  deep navigation regulation project  dredge disposal zone  sediment loss ratio  stationary-piston sampler