三峡施工期葛洲坝通航水位工程措施研究
引用本文:赵连白,张秀芹,刘万利.三峡施工期葛洲坝通航水位工程措施研究[J].水道港口,2002,23(2):66-72.
作者姓名:赵连白  张秀芹  刘万利
作者单位:交通部天津水运工程科学研究所,天津,300456
基金项目:"九五"长江三峡工程泥沙问题研究(95-1-1)
摘    要:通过葛洲坝下游宜昌河段的水文资料分析 ,提出了三峡工程施工期间 ,葛洲坝三江航道将面临断航的威胁 ;在定床实体模型上 ,进行了整治工程方案试验研究 ,提出的潜坝整治方案可基本解决三峡施工期的通航水深问题

关 键 词:葛洲坝三江航道  整治工程措施  定床实体模型
文章编号:1005-8443(2002)02-0066-07
修稿时间:2002年3月26日

On Construction Measures for Navigable Depth of Gezhouba Dam During Construction of the Three-Gorges Project
Abstract:From the analysis of hydrolic data of Yichang Reach at downstrean water of Gezhouba Dam,it's consi dered that navigation in Sanjiang Channel will be influenced during the constrution of the three Gorge project.Therefore,test study on the regulation scheme is performed on the fixed bed model and the problem of navigable depth during the construction of the Three Gorge Project will be basically solved by the regulation scheme proposed in the paper.
Keywords:Sanjiang Channel of Gezhouba Dam  regulation measures  fixed  bed model