那吉航运枢纽溢流坝断面及坝下冲刷试验 |
| |
引用本文: | 孟祥玮,刘红华,周华兴.那吉航运枢纽溢流坝断面及坝下冲刷试验[J].水道港口,2003,24(1):14-18. |
| |
作者姓名: | 孟祥玮 刘红华 周华兴 |
| |
作者单位: | 交通部天津水运工程科学研究所,天津300456 |
| |
摘 要: | 采用比尺为 1∶30水工断面模型 ,进行溢流坝断面设计方案的过流能力、坝面压力及坝下消能局部冲刷试验 ,经优化提出的坝面曲线及消能工方案 ,改善了消力池水流条件、减小了冲刷、节约了工程量
|
关 键 词: | 航运枢纽 断面模型 消能工 坝下冲刷 |
文章编号: | 1005-8443(2003)01-0014-05 |
修稿时间: | 2002年12月18 |
Tests on Section of Overflow Dam and Degradation Below Dam of Naji Navigation Project |
| |
Abstract: | Flow capacity,pressure on dam face and energy disspation below dam was performed for sectionad design of overflow dam on the hydraulic sectional model with the scale of 1:30.From the tests, an optimum dam curve and energy obsorber is propose.As a result,flow condition of the energy disspating basin is improved,slucing capacity is reduced and investment saved. |
| |
Keywords: | navigation project sectional model energy absorber degradation below dam |