那吉航运枢纽施工导流模型试验研究 |
| |
引用本文: | 李焱,周华兴,郑宝友.那吉航运枢纽施工导流模型试验研究[J].水道港口,2004,25(3):145-149. |
| |
作者姓名: | 李焱 周华兴 郑宝友 |
| |
作者单位: | 交通部天津水运工程科学研究所,天津,300456 |
| |
摘 要: | 通过1:100定床整体水工模型,对一期导流明渠的泄流能力、流速流态、通航水流条件和二期3孔导流的泄流能力、船闸的通航水流条件进行了试验研究。研究表明,一、二期导流工程泄流能力满足设计要求,通航水流条件满足施工期要求。
|
关 键 词: | 那吉航运枢纽 施工导流 通航条件 |
文章编号: | 1005-8443(2004)03-0145-05 |
修稿时间: | 2003年12月25 |
Model Test on Diversion Works in Construction of Naji Hydro-junction |
| |
Abstract: | Through fix-bed hydraulic model with the scale of 1:100,discharging capacity,velocity,flow pattern and navigation conditions in the diversion channel of the First Phase Project is tested,and the discharging capacity of the waterlocks and the navigation conditions of the shiplock in the Second Phase Project is tested as well.It shows that both the discharging capacity and the navigation conditions meet the demands of the projects. |
| |
Keywords: | Naji Hydro-junction diversion works in construction navigation conditions |
本文献已被 维普 万方数据 等数据库收录! |
|