共查询到10条相似文献,搜索用时 15 毫秒
1.
2.
Research purposes: The vertical deformation of high-speed railway (HSR) bridge will cause the track irregularity, which threatens the safe and efficient operation of the HSR. Taking the 32 m simple supported beam bridge as the research object, based on the existing mapping analytical model for bridge vertical deformation and rail geometry, the influence of the track regularity of the CRTS Ⅰ slab ballastless track structure caused by the key parameters such as the bridge vertical deformation amplitude, the hanging length of the beam end and the vertical stiffness of mortar layer were studied, and the corresponding measures to control the rail deformation were proposed, to provide theoretical reference for comprehensive treatment of rail deformation of HSR bridge. Research conclusions:(1) The pier settlement, the vertical rotation of the beam end and the beam fault will cause the rail to follow the beam deformation, and "up-warping" of the rail on the vertical deformation boundary will appear. (2) The rail deformation is directly proportional to the vertical deformation amplitude of the bridge and the key to control the rail deformation is to reduce the vertical deformation of the bridge. (3) The rail deformation can be controlled by reducing the hanging length of beam and vertical stiffness of mortar layer. (4) The research results can provide a theoretical reference for controlling the vertical rail deformation of high-speed railway bridges. © 2018, Editorial Department of Journal of Railway Engineering Society. All right reserved. 相似文献
3.
《现代城市轨道交通》2009,(2):I0001-I0001
Applying the Scientific Outlook on Development to Promote the Construction of Urban Rail Transit
-C Thinking on Current Construction Development of China Urban Rail Transit Jiao Tongshan 1
The construction of China Urban Rail Transit is now staying in the important time with rapid development. The achievements we obtained are objectively summarized. At the same time, the contradiction between the current construction speed and preliminary work, the construction procedure, the phenomena of despising operation, the unified planning of traffic integration, the control of construction standards, the difference of fare in domestic urban rail transit, as well as the enhancement of government management for urban rail transit are analyzed and investigated through some phenomena in the industry. Several suggestions are also presented. 相似文献
-C Thinking on Current Construction Development of China Urban Rail Transit Jiao Tongshan 1
The construction of China Urban Rail Transit is now staying in the important time with rapid development. The achievements we obtained are objectively summarized. At the same time, the contradiction between the current construction speed and preliminary work, the construction procedure, the phenomena of despising operation, the unified planning of traffic integration, the control of construction standards, the difference of fare in domestic urban rail transit, as well as the enhancement of government management for urban rail transit are analyzed and investigated through some phenomena in the industry. Several suggestions are also presented. 相似文献
4.
《现代城市轨道交通》2009,(3):I0001-I0001
Security Technology of Japan Shinkansen Railway Yu Zhanyou 1
The operation record with zero mortality of Japan Shinkansen for 45 years is based on their management idea of "safety first", strong disaster prevention awareness, advanced and mature technology but not pursuing the most advanced guiding ideology, a set of legal procedures, the severe technology certification system, the accurate traffic control system, the strict overhaul system, as well as the examination and maintenance system. In this paper, the successful experiences of Japan Railway are introduced and summarized, which have important references for safety guarantee of China urban rail transit industry. 相似文献
The operation record with zero mortality of Japan Shinkansen for 45 years is based on their management idea of "safety first", strong disaster prevention awareness, advanced and mature technology but not pursuing the most advanced guiding ideology, a set of legal procedures, the severe technology certification system, the accurate traffic control system, the strict overhaul system, as well as the examination and maintenance system. In this paper, the successful experiences of Japan Railway are introduced and summarized, which have important references for safety guarantee of China urban rail transit industry. 相似文献
5.
6.
为研究隧道掘进机(TBM)从施作好的地铁车站中板上整体步进过站的技术,依托重庆地铁6号线工程,设计"弧底导轨"TBM中板步进过站方案和车站中板加固方案;通过数值模拟实际工况和对施工过程的监测,验证设计方案的合理性。结果表明:TBM中板步进过站时,采用"弧底导轨"方案合理可行;在弧形导台沿TBM步进方向设置上翻梁以及梁下设置钢支撑体系,可保证TBM过站时中板结构的安全;中板结构受TBM荷载影响的范围主要集中在TBM机头作用点前方10m至后支撑作用点间的27m区域内;"弧底导轨"可有效地将TBM自重荷载传递给钢支撑体系和底板,确保中板结构的安全;车站中板内的上翻梁和梁下的钢支撑体系加强了中板结构的整体刚度,减小了变形开裂,保证了TBM过站后地铁车站的安全运营。 相似文献
7.
分析总结了长床身导轨在调平时的精度要求、基准的选定、直线度的检测以及检验桥板的选用等要点,明确床身导轨调平时的概念,以指导生产现场长床身导轨调平时的检测。 相似文献
8.
9.
高磊 《城市轨道交通研究》2017,20(11)
介绍了导轨式胶轮电车功能定位,基于天津滨海和上海张江两条试验线的运用情况,从检修工艺、检修制度等方面,分析导轨式胶轮电车检修工艺的特点,为导轨式胶轮电车车辆基地的设计提供参考。 相似文献
10.
针对机床导轨磨削表面发生的质量问题进行分析,得知导轨磨床横梁升降速度太快、立磨头主轴角度不符合磨削技术要求的具体原因,确定设计蜗轮减速箱、立磨头微调机构,有效地保证大修机床导轨磨削平面的表面质量技术要求。 相似文献