首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
To further improve the utilization rate of railway tracks and reduce train delays, this paper focuses on developing a high-efficiency train routing and timetabling approach for double-track railway corridors in condition that trains are allowable to travel on reverse direction tracks. We first design an improved switchable policy which is rooted in the approaches by Mu and Dessouky (2013), with the analysis of possible delays caused by different path choices. Then, three novel integrated train routing and timetabling approaches are proposed on the basis of a discrete event model and different dispatching rules, including no switchable policy (No-SP), Mu and Dessouky (2013)’s switchable policy (Original-SP) and improved switchable policy (Improved-SP). To demonstrate the performance of the proposed approaches, the heterogeneous trains on Beijing–Shanghai high speed railway are scheduled by aforementioned approaches. The case studies indicate that in comparison to No-SP and Original-SP approaches, respectively, the Improved-SP approach can reduce the total delay of trains up to 44.44% and 73.53% within a short computational time. Moreover, all of the performance criteria of the Improved-SP approach are usually better than those of other two approaches.  相似文献   

2.
This paper proposes a mathematical model for the train routing and timetabling problem that allows a train to occasionally switch to the opposite track when it is not occupied, which we define it as switchable scheduling rule. The layouts of stations are taken into account in the proposed mathematical model to avoid head-on and rear-end collisions in stations. In this paper, train timetable could be scheduled by three different scheduling rules, i.e., no switchable scheduling rule (No-SSR) which allows trains switching track neither at stations and segments, incomplete switchable scheduling rule (In-SSR) which allows trains switching track at stations but not at segments, and complete switchable scheduling rule (Co-SSR) which allows trains switching track both at stations and segments. Numerical experiments are carried out on a small-scale railway corridor and a large-scale railway corridor based on Beijing–Shanghai high-speed railway (HSR) corridor respectively. The results of case studies indicate that Co-SSR outperforms the other two scheduling rules. It is also found that the proposed model can improve train operational efficiency.  相似文献   

3.
Because of different geo‐demographic and economic conditions, the impact of the new passenger modes (road and air) on rail travel was much larger in North America than in Europe. In 1960s and 1970s, as the railway share of intercity traffic in North America shrunk to a negligible one or two percent, the passenger trains were abandoned by private railway companies and taken over by state organizations, which have continued to operate traditional trains and generate mounting losses. On the technology side, no attempts have been made to improve competitiveness of trains vis‐a‐vis automobiles and airplanes.

In Europe and Japan, the railways responded to the challenge by (i) upgrading the performance (speed) and comfort of traditional trains operating on existing tracks and (ii) developing trains which could, on short and intermediate range distances, compete successfully, in terms of speed and economy, with the road and air modes. The Japanese (Shinkansen trains) and French (TGV trains) experience clearly shows that trains operating on dedicated lines at average speeds of 150 to 200 km/hr provide a superior transportation service and economy on high‐traffic intercity routes of up to about 500 km length. In this paper the factors responsible for the present status of passenger rail in North America are analysed, the current policies in the U.S. and Canada are evaluated in the light of experience to date and developments abroad, and suggestions for a long‐term passenger rail policy are made. This includes examination of (i) the viability of continued subsidization of traditional train services, (ii) the viability of operation of faster trains on existing tracks, (iii) the scope for introduction of modern, fast trains on dedicated lines in high‐density, intercity corridors, (iv) the application of fast trains as access to major airports and integration of airports with fast intercity lines, and (v) the impact of energy (oil) consumption in transportation.

  相似文献   

4.

High-speed rail operations have the potential to reduce the long-term decline in rail passenger travel demand for the medium to long distance inter-urban markets. Such decline has been evident through most of the industrialized countries where air and road transport tend to be the dominant modes. In China, the operations of long distance high-speed rail on fully dedicated track is not very easy to implement, due to the high proportion of passengers who travel between high-speed and conventional railways. An alternative approach would be to allow for mixed operations with trains of various speeds on the same track. This article puts forward a simulation model designed to allow an evaluation of the most efficient distance for high-speed rail operations under mixed train speed scenarios. The model takes into account the main operating parameters such as passenger volumes, train speeds, capital and maintenance costs, train operating costs and energy consumption. The distance of high-speed train running on conventional rail that will yield the most economic benefit can be estimated using the model. The article includes the results of using the model for a specific example. It is concluded that large-scale high-speed trains have the potential to be successfully operated on conventional rail networks.  相似文献   

5.
In a heavily congested metro line, unexpected disturbances often occur to cause the delay of the traveling passengers, infeasibility of the current timetable and reduction of the operational efficiency. Due to the uncertain and dynamic characteristics of passenger demands, the commonly used method to recover from disturbances in practice is to change the timetable and rolling stock manually based on the experiences and professional judgements. In this paper, we develop a stochastic programming model for metro train rescheduling problem in order to jointly reduce the time delay of affected passengers, their total traveling time and operational costs of trains. To capture the complexity of passenger traveling characteristics, the arriving ratio of passengers at each station is modeled as a non-homogeneous poisson distribution, in which the intensity function is treated as time-varying origin-to-destination passenger demand matrices. By considering the number of on-board passengers, the total energy usage is modeled as the difference between the tractive energy consumption and the regenerative energy. Then, we design an approximate dynamic programming based algorithm to solve the proposed model, which can obtain a high-quality solution in a short time. Finally, numerical examples with real-world data sets are implemented to verify the effectiveness and robustness of the proposed approaches.  相似文献   

6.
This paper studies strategic level train planning for high performance passenger and freight train operations on shared-use corridors in the US. We develop a hypergraph-based, two-level approach to sequentially minimize passenger and freight costs while scheduling train services. Passenger schedule delay and freight lost demand are explicitly modeled. We explore different solution strategies and conclude that a problem-tailored linearized reformulation yields superior computational performance. Using realistic parameter values, our numerical experiments show that passenger cost due to schedule delay is comparable to in-vehicle travel time cost and rail fare. In most cases, marginal freight cost increase from scheduling more passenger trains is higher than marginal reduction in passenger schedule delay cost. The heterogeneity of train speed reduces the number of freight trains that can run on a corridor. Greater tolerance for delays could reduce lost demand and overall cost on the freight side. The approach developed in the paper could be applied to other scenarios with different parameter values.  相似文献   

7.
The paper presents a model for determining the practical capacity of a single track line, i.e. the maximum number of trains which can be run along it in a time unit under the condition that each train enters its bottleneck segment with a definite delay.

The input data used in the model are: geometrical characteristics of the bottleneck segment of the line under study, the intensity and structure of demand expressed by a number of trains which are run over the line in a given time unit, the scenario of traffic running over the line under study and the operational tactics of individual train categories processing on the bottleneck segment.

(Two tactics can be applied in the train processing on the line under study; first, the trains of individual categories are given different priorities in the processing, and second, all the trains have the same priority).

The output results of the model are average delays of trains of each category occurring within the train processing performed on the bottleneck segment of the line under study in a given time unit.  相似文献   

8.
Railroad technology permits a single train to move a large number of individual freight cars. However, cars which are not in dedicated unit train or intermodal service experience considerable delay due to the consolidation and breakup of trains. Rail operations thus involve a tradeoff between the economies of shipment consolidation, and the resulting delays. More direct and/or more frequent train connections will increase costs, but reduce transit times. This article quantifies the cost of providing a range of transit times for general carload traffic for several representative U.S. rail systems. It shows that significant reductions in transit time will require a large increase in the number of train connections and operating cost. Changes in labor contracts to reduce train crew cost will provide some incentive for higher service levels, but reductions in crew cost alone cannot be expected to dramatically improve the performance of the carload segment of the industry.  相似文献   

9.
Although people are often encouraged to use public transportation, the riding experience is not always comfortable. This study uses service items to measure passenger anxieties by applying a conceptual model based on the railway passenger service chain perspective. Passenger anxieties associated with train travel are measured using a modern psychometric method, the Rasch model. This study surveys 412 train passengers. Analytical results indicate that the following service items cause passenger anxiety during trains travel: crowding, delays, accessibility to a railway station, searching for the right train on a platform, and transferring trains. Empirical results obtained using the Rasch approach can be used to derive an effective strategy to reduce train passenger anxiety. This empirical study also demonstrates that anxiety differs based on passenger sex, age, riding frequency, and trip type. This information will also prove useful for transportation planners and policy-makers when considering the special travel needs of certain groups to create a user-friendly railway travel environment that promotes public use.  相似文献   

10.
Train dispatching is vital for the punctuality of train services, which is critical for a train operating company (TOC) to maintain its competitiveness. Due to the introduction of competition in the railway transport market, the issue of discrimination is attracting more and more attention. This paper focuses on delivering non-discriminatory train dispatching solutions while multiple TOCs are competing in a rail transport market, and investigating impacting factors of the inequity of train dispatching solutions. A mixed integer linear programming (MILP) model is first proposed, in which the inequity of competitors (i.e., trains and TOCs) is formalized by a set of constraints. In order to provide a more flexible framework, a model is further reformulated where the inequity of competitors is formalized as the maximum individual deviation of competitors’ delay cost from average delay cost in the objective function. Complex infrastructure capacity constraints are considered and modelled through a big M-based approach. The proposed models are solved by a standard MILP solver. A set of comprehensive experiments is conducted on a real-world dataset adapted from the Dutch railway network to test the efficiency, effectiveness, and applicability of the proposed models, as well as determine the trade-off between train delays and delay equity.  相似文献   

11.
Planning a set of train lines in a large-scale high speed rail (HSR) network is typically influenced by issues of longer travel distance, high transport demand, track capacity constraints, and a non-periodic timetable. In this paper, we describe an integrated hierarchical approach to determine line plans by defining the stations and trains according to two classes. Based on a bi-level programming model, heuristics are developed for two consecutive stages corresponding to each classification. The approach determines day-period based train line frequencies as well as a combination of various stopping patterns for a mix of fast trunk line services between major stations and a variety of slower body lines that offer service to intermediate stations, so as to satisfy the predicted passenger transport demand. Efficiencies of the line plans described herein concern passenger travel times, train capacity occupancy, and the number of transfers. Moreover, our heuristics allow for combining many additional conflicting demand–supply factors to design a line plan with predominantly cost-oriented and/or customer-oriented objectives. A range of scenarios are developed to generate three line plans for a real-world example of the HSR network in China using a decision support system. The performance of potential train schedules is evaluated to further examine the feasibility of the obtained line plans through graphical timetables.  相似文献   

12.
When looking at railway planning, a discrepancy exists between planners who focus on the train operations and publish fixed railway schedules, and passengers who look not only at the schedules but also at the entirety of their trip, from access to waiting to on-board travel and egress. Looking into this discrepancy is essential, as assessing railway performances by merely measuring train punctuality would provide an unfair picture of the level of service experienced by passengers. Firstly, passengers’ delays are often significantly larger than the train delays responsible for the passengers to be late. Secondly, trains’ punctuality is often strictly related to too tight schedules that in turn might translate into knock-on delays for longer dwelling times at stations, trip delays for increased risk of missing transfer connections, and uncertain assessment of the level of service experienced, especially with fluctuating passenger demand. A key aspect is the robustness of railway timetables. Empirical evidence indicates that passengers give more importance to travel time certainty than travel time reductions, as passengers associate an inherent disutility with travel time uncertainty. This disutility may be broadly interpreted as an anxiety cost for the need for having contingency plans in case of disruptions, and may be looked at as the motivator for the need for delay-robust railway timetables. Interestingly, passenger-oriented optimisation studies considering robustness in railway planning typically limit their emphasis on passengers to the consideration of transfer maintenance. Clearly, passengers’ travel behaviour is far more complex and multi-faceted and thus several other aspects should be considered, as becoming more and more evident from passenger surveys. The current literature review starts by looking at the parameters that railway optimisation/planning studies are focused on and the key performance indicators that impact railway planning. The attention then turns to the parameters influencing passengers’ perceptions and travel experiences. Finally, the review proposes guidelines on how to reduce the gap between the operators’ railway planning and performance measurement on the one hand and the passengers’ perception of the railway performance on the other hand. Thereby, the conclusions create a foundation for a more passenger-oriented railway timetabling ensuring that passengers are provided with the best service possible with the resources available.  相似文献   

13.
The train trajectory optimization problem aims at finding the optimal speed profiles and control regimes for a safe, punctual, comfortable, and energy-efficient train operation. This paper studies the train trajectory optimization problem with consideration of general operational constraints as well as signalling constraints. Operational constraints refer to time and speed restrictions from the actual timetable, while signalling constraints refer to the influences of signal aspects and automatic train protection on train operation. A railway timetable provides each train with a train path envelope, which consists of a set of positions on the route with a specified target time and speed point or window. The train trajectory optimization problem is formulated as a multiple-phase optimal control model and solved by a pseudospectral method. This model is able to capture varying gradients and speed limits, as well as time and speed constraints from the train path envelope. Train trajectory calculation methods under delay and no-delay situations are discussed. When the train follows the planned timetable, the train trajectory calculation aims at minimizing energy consumption, whereas in the case of delays the train trajectory is re-calculated to track the possibly adjusted timetable with the aim of minimizing delays as well as energy consumption. Moreover, the train operation could be affected by yellow or red signals, which is taken into account in the train speed regulation. For this purpose, two optimization policies are developed with either limited or full information of the train ahead. A local signal response policy ensures that the train makes correct and quick responses to different signalling aspects, while a global green wave policy aims at avoiding yellow signals and thus proceed with all green signals. The method is applied in a case study of two successive trains running on a corridor with various delays showing the benefit of accurate predictive information of the leading train on energy consumption and train delay of the following train.  相似文献   

14.
A new approach for improving the performance of freight train timetabling for single-track railways is proposed. Using the idea of a fixed-block signaling system, we develop a matrix representation to express the occupation of inter- and intra-station tracks by trains illustrating the train blocking time diagram in its entirety. Train departure times, dwell times, and unnecessary stopping are adjusted to reduce average train travel time and single train travel time. Conflicts between successive stations and within stations are identified and solved. A fuzzy logic system is further used to adjust the range of train departure times and checks are made to determine whether dwell times and time intervals can be adjusted for passenger and freight trains at congested stations to minimize train waiting times. By combining manual scheduling expertise with the fuzzy inference method, timetable efficiency is significantly improved and becomes more flexible.  相似文献   

15.
A heuristic for the train pathing and timetabling problem   总被引:5,自引:0,他引:5  
In a railroad system, train pathing is concerned with the assignment of trains to links and tracks, and train timetabling allocates time slots to trains. These important tasks were traditionally done manually, but there is an increasing move toward automated software based on mathematical models and algorithms. Most published models in the literature either focus on train timetabling only, or are too complicated to solve when facing large instances. In this paper, we present an optimization heuristic that includes both train pathing and train timetabling, and has the ability to solve real-sized instances. This heuristic allows the operation time of trains to depend on the assigned track, and also lets the minimum headway between the trains to depend on the trains’ relative status. It generates an initial solution with a simple rule, and then uses a four-step process to derive the solution iteratively. Each iteration starts by altering the order the trains travel between stations, then it assigns the services to the tracks in the stations with a binary integer program, determines the order they pass through the stations with a linear program, and uses another linear program to produce a timetable. After these four steps, the heuristic accepts or rejects the new solution according to a Threshold Accepting rule. By decomposing the original complex problem into four parts, and by attacking each part with simpler neighborhood-search processes or mathematical programs, the heuristic is able to solve realistic instances. When tested with two real-world examples, one from a 159.3 km, 29-station railroad that offers 44 daily services, and another from a 345 km, eight-station high-speed rail with 128 services, the heuristic obtained timetables that are at least as good as real schedules.  相似文献   

16.
The objective of the research described in this paper was to develop a model for computation of an ultimate capacity of a single track line and to provide a sensitivity analysis of this capacity to the parameters which influence it. The model is based in a concept of mathematical expectation of capacity and can be applied under saturation conditions i.e. a constant demand for service. It can serve for planning purposes, computation of single track line capacity on the base of which estimations are possible concerning a single track line performance under given conditions, as well as commercial time‐tables planning, decisions about a partial or complete construction of the second parallel track along the line in service, intermediate stations locations planning and the necessary facilities along the line under construction.

In the sensitivity analysis, the model allows a change of parameters upon which the capacity depends. These are: the length of the line segment which is considered to be bottleneck for calculation of capacity, traffic distributions per directions, train mix, train velocities and train spacing rules applied by the dispatching service when regulating the traffic on a line.  相似文献   

17.
This paper presents a method for designing a single-track rail line for a reliable high-speed passenger train service. We first consider deterministic train performance and describe a general method for finding the best location and length of the passing tracks. The design is then modified to include slack, which is necessary to ensure on-time performance for trains encountering unexpected delay. An analysis of the robustness of the system to small delays is presented. Robustness to large train delays and slower traffic is incorporated through the provision of additional sidings. Finally, simulation results are presented which compare the performance of a single-track line to a fully double-tracked equivalent.  相似文献   

18.
This article discusses approaches to the determination of railway capacity and the significance of the following factors on capacity: mix of trains, length and weight of trains, direction of train travel, acceleration and deceleration, stopping protocols of trains, location and length of crossing loops, location of signals, length of sections, dwell times and sectional running times. A more accurate method to calculate railway capacity is developed using previously unaddressed aspects for capacity determination. Capacity and pricing are two key issues for organizations involved with open track access regimes. A train access charging methodology is therefore developed and incorporated into a railway capacity determination model.  相似文献   

19.
This paper investigates the coordinated cruise control strategy for multiple high-speed trains’ movement. The motion of an ordered set of high-speed trains running on a railway line is modeled by a multi-agent system, in which each train communicates with its neighboring trains to adjust its speed. By using the potential fields and LaSalles invariance principle, we design a new coordinated cruise control strategy for each train based on the neighboring trains’ information, under which each train can track the desired speed, and the headway distances between any two neighboring trains are stabilized in a safety range. Numerical examples are given to illustrate the effectiveness of the proposed methods.  相似文献   

20.
Optimal rail network infrastructure and rolling stock utilization can be achieved with use of different scheduling tools by extensive planning a long time before actual operations. The initial train timetable takes into account possible smaller disturbances, which can be compensated within the schedule. Bigger disruptions, such as accidents, rolling stock breakdown, prolonged passenger boarding, and changed speed limit cause delays that require train rescheduling. In this paper, we introduce a train rescheduling method based on reinforcement learning, and more specifically, Q-learning. We present here the Q-learning principles for train rescheduling, which consist of a learning agent and its actions, environment and its states, as well as rewards. The use of the proposed approach is first illustrated on a simple rescheduling problem comprising a single-lane track with three trains. The evaluation of the approach is performed on extensive set of experiments carried out on a real-world railway network in Slovenia. The empirical results show that Q-learning lead to rescheduling solutions that are at least equivalent and often superior to those of several basic rescheduling methods that do not rely on learning agents. The solutions are learned within reasonable computational time, a crucial factor for real-time applications.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号